Acorn builds contracts team: asbestos project control lessons for engineers
Reviewed by Joe Ashwell

First reported on The Construction Index
30 Second Briefing
Asbestos management consultancy Acorn Analytical Services has expanded its contracts team, promoting long-serving staff member David Kelsey to senior contracts manager and elevating Ellis Bastable and Charlie Dalby to contracts managers. Kelsey, one of Acorn’s first full-time employees with nearly 13 years’ service, will oversee the contracts department, manage two contracts managers and ensure nationwide deployment of asbestos analysts. Bastable and Dalby, both former asbestos analysts who gained BOHS P402 surveying qualifications, will now manage client asbestos portfolios, coordinate removal works and arrange analytical support.
Technical Brief
- Both new contracts managers have prior field experience as asbestos analysts, strengthening method statements and QA of analytical work.
- Kelsey’s background as an asbestos awareness trainer supports alignment of project delivery with UK asbestos regulations and site induction needs.
- Managing client asbestos “requirements” typically covers survey scoping, reinspection cycles and updating asbestos registers for compliance audits.
- Coordination of removal works by ex-analysts improves interface between survey findings, enclosure design and air monitoring strategies.
- Similar role structures in other consultancies can reduce coordination failures between survey, removal contractor and independent analyst.
Our Take
For United Kingdom projects, our coverage shows that specialist safety and analytical firms increasingly sit as long-term framework partners rather than ad hoc consultants, so Acorn’s expanding team is likely positioning the company to service multi-year portfolios rather than one-off surveys.
Given that Acorn is tagged under both ‘Projects’ and ‘Safety’ rather than ‘Incidents’, this growth phase suggests contractors are investing in pre-emptive hazards work—such as specification, survey scoping and method statements—rather than relying solely on on-site mitigation once construction is underway.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.


