Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Contract Award

    ABB GMD and RMD for Harmony’s Eva Copper Mine: grinding design notes for engineers

    April 15, 2026|

    Reviewed by Tom Sullivan

    ABB GMD and RMD for Harmony’s Eva Copper Mine: grinding design notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    ABB has secured a contract to supply both gearless mill drive (GMD) and ring-geared mill drive (RMD) systems for Harmony Gold’s Eva Copper Mine Project, a new open-pit operation about 75 km north of Cloncurry in northwest Queensland. The package will cover large SAG and ball mill installations, combining high-torque GMDs with RMDs for smaller mills to optimise grinding circuit flexibility and electrical efficiency. For process and electrical engineers, the choice of mixed GMD/RMD architecture signals a focus on variable-speed control, reduced mechanical components and lower maintenance in a greenfield copper concentrator.

    Technical Brief

    • Mixed GMD/RMD configuration allows differential speed ranges between primary and secondary grinding stages.
    • Gearless drives reduce gearbox requirements, cutting rotating mass and associated alignment and lubrication tasks.
    • Ring-geared drives on smaller mills retain conventional pinion arrangements, easing spares and maintenance planning.

    Our Take

    Our database shows multiple 2026 items on ABB’s newer ABB Ability platforms and AI-enabled energy management, suggesting the Eva Copper Mine in northwest Queensland is likely to be an early adopter of ABB’s more data‑rich grinding and power-control stack rather than a legacy configuration.

    With Aggreko already contracted for a long‑term hybrid power facility at the Eva Copper Mine, ABB’s GMD/RMD package positions the project as a testbed for tightly integrated electrical and process optimisation in off‑grid Australian copper operations, which could become a reference model for other remote Queensland sites.

    Harmony Gold’s role in this Australian copper project stands out in our coverage, where Harmony is more often associated with gold assets in Africa; this diversification into base metals in Queensland may give it additional leverage to secure advanced OEM technology packages like ABB’s on more favourable terms.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    MAX Power Mining–Moose Jaw hydrogen MOU: subsurface and capex notes for engineers
    Mining
    about 16 hours ago

    MAX Power Mining–Moose Jaw hydrogen MOU: subsurface and capex notes for engineers

    MAX Power Mining has signed an MOU with the City of Moose Jaw, Saskatchewan, to advance natural hydrogen commercialisation in the Regina–Moose Jaw Industrial Corridor, centred on the Lawson Natural Hydrogen system near Central Butte, about 80 km northwest of the city. Core desorption tests from nine samples in Cambrian Basal sands above the Basement Complex discovery returned helium values up to 8.7%, averaging 4.4%, indicating a potentially valuable hydrogen–helium system. The partners aim to leverage existing regional infrastructure and policy support to move the project towards commercial validation.

    Water shortages and mining projects: schedule and design takeaways for engineers
    Mining
    about 18 hours ago

    Water shortages and mining projects: schedule and design takeaways for engineers

    Water scarcity and multi‑year permitting delays—often two to four years for discharge and dewatering approvals in the western US—are increasingly stalling otherwise bankable mines, with water risk now affecting project schedules, financing and national credit profiles. Consultants such as Woodard & Curran report that “credible water stories” are becoming as critical as ore grades, pushing operators towards closed‑loop recycling and non‑traditional sources. US firms Genesis Systems and Atoco are deploying atmospheric water generation units, including Genesis’ containerised WaterCube systems producing over 1,000 gallons per day off‑grid, now trialled at mine sites.

    Nouveau Monde’s Matawinie graphite mine: capex, schedule and offtake lens for engineers
    Mining
    about 21 hours ago

    Nouveau Monde’s Matawinie graphite mine: capex, schedule and offtake lens for engineers

    Nouveau Monde Graphite has approved construction of the Matawinie open-pit mine in Saint-Michel-des-Saints, Quebec, designed to produce about 106,000 tonnes per year of graphite concentrate over more than 25 years and powered by the provincial hydroelectric grid. The company has secured roughly $644.5 million in equity and debt, with total capex for Matawinie and the Bécancour battery material plant now estimated at about $634 million after downsizing the plant from the 2025 feasibility study. A 30‑month build is planned to reach full production by end‑2028, with 75% of output under offtake, including a seven‑year, 30,000‑t/y fixed‑price contract with the Government of Canada.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental