Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Sandvik’s €15m Tampere expansion: R&D and testing implications for mine engineers
    Mining
    9 months ago

    Sandvik’s €15m Tampere expansion: R&D and testing implications for mine engineers

    Sandvik will invest about €15 million in extending the main building at its Tampere, Finland, site to support operational development, competitiveness and future growth in its rock drilling and crushing equipment business. The project will create multi-purpose work and development spaces, consolidating R&D, prototyping and manufacturing functions that currently sit in separate facilities. For mining clients, a larger integrated Tampere hub should accelerate product development cycles and testing of new underground and surface drilling systems under Nordic hard-rock conditions.

    2026 global construction cost rise: delivery risk takeaways for project teams
    Infrastructure
    9 months ago

    2026 global construction cost rise: delivery risk takeaways for project teams

    Global construction costs are forecast to rise about 2.4% in 2026, with analysts pointing to pressure from labour availability, supply chain fragility, energy prices and geopolitical instability. Even a modest cost uplift at this level can erode contingencies on large infrastructure schemes, particularly those with fixed-price EPC contracts or long-lead materials such as structural steel and specialist M&E systems. Contractors and clients may need tighter risk allowances, more flexible procurement, and scenario-based programming to protect delivery on complex civils and geotechnical works.

    Nista-led Transport and Infrastructure Campus: delivery impacts for project engineers
    Infrastructure
    9 months ago

    Nista-led Transport and Infrastructure Campus: delivery impacts for project engineers

    A new Nista-led Transport and Infrastructure Campus in the West Midlands will co-locate Department for Transport, Ministry of Housing, Communities and Local Government, and Cabinet Office teams to accelerate project delivery. The hub will integrate transport, property and infrastructure specialists to streamline approvals and programme management for major schemes across the region. For civil and geotechnical consultants, this signals a push for earlier multi-disciplinary input, tighter design–construction interfaces and potentially shorter decision cycles on rail, road and urban regeneration projects.

    UK framework for advanced nuclear reactors: design and risk notes for engineers
    Infrastructure
    9 months ago

    UK framework for advanced nuclear reactors: design and risk notes for engineers

    The UK Government has launched a new framework to speed up delivery of advanced nuclear reactors, aiming to cut project timelines and draw in private capital for next‑generation plants such as small modular reactors. The framework is expected to streamline planning and licensing processes with clearer milestones for developers and regulators, and to support early-stage design work and site assessment. Civil and geotechnical engineers should anticipate earlier engagement on nuclear‑grade foundations, seismic qualification and long‑term cooling water and grid connection infrastructure.

    A96 dualling in phases: design, safety and traffic staging notes for engineers
    Infrastructure
    9 months ago

    A96 dualling in phases: design, safety and traffic staging notes for engineers

    The Scottish Government has restated its plan to fully dual the A96 trunk road between Inverness and Aberdeen but will deliver the upgrade in phases due to current budget constraints. The 160km corridor, a key link for HGVs and regional freight, is expected to see staged design and construction packages rather than a single continuous programme. Phasing will affect timing of junction upgrades, overtaking provision and safety improvements, which will be critical for designers planning earthworks, structures and drainage around existing live traffic.

    Welsh Government water governance reforms: key implications for engineers
    Policy
    9 months ago

    Welsh Government water governance reforms: key implications for engineers

    Welsh Government has issued a green paper proposing “once‑in‑a‑generation” reforms to water governance in Wales, signalling potential structural changes to how water resources, wastewater and flood risk are regulated and managed. The proposals could reshape the roles of Welsh Water (Dŵr Cymru), Natural Resources Wales and local authorities in asset planning, abstraction control and river basin management. Civil and water engineers should expect future shifts in consenting, resilience standards and long‑term investment planning for treatment works, drainage networks and flood defences.

    NIE Networks £83M civils framework: scope and delivery notes for project teams
    Infrastructure
    9 months ago

    NIE Networks £83M civils framework: scope and delivery notes for project teams

    Northern Ireland Electricity (NIE) Networks has launched procurement for an £83M multi-year civil engineering framework to support upgrades and new builds across its electricity distribution and transmission assets. The framework is expected to cover substation platforms, cable trenching, ducting, foundations and associated earthworks for overhead lines and underground cables across Northern Ireland. Contractors will need capability for large-volume excavation, backfilling and concrete works in live network environments, with programmes likely driven by grid reinforcement for renewables connections and resilience improvements.

    Spittal–Peterhead 203km HVDC link: geotechnical design notes for engineers
    Infrastructure
    9 months ago

    Spittal–Peterhead 203km HVDC link: geotechnical design notes for engineers

    SSEN Transmission has begun onshore and nearshore construction for its 203km Spittal to Peterhead subsea HVDC link, designed to export renewable power from Caithness to Aberdeenshire. The scheme involves landfall works, transition joint bays and onshore cable sections tying into converter stations at each end, enabling bulk transfer of offshore wind output into the Scottish transmission network. Marine installation of the HVDC cable will demand detailed seabed surveys, burial design and protection measures to manage geotechnical risk along the North Sea route.

    Pension sector call for objections charge: planning reform lens for project teams
    Policy
    9 months ago

    Pension sector call for objections charge: planning reform lens for project teams

    A major UK pensions firm is urging government to reform planning rules so housing, energy and water infrastructure can be delivered faster and provide a more “investable” long‑term pipeline. Proposals include charging objectors to lodge planning objections, tightening time limits on judicial review, and reducing scope for repeat challenges by small activist or single‑issue groups. For engineers, the changes would aim to cut multi‑year delays on nationally significant infrastructure projects, improving programme certainty and financing conditions for large capital schemes.

    XCMG–Fortescue ‘real zero’ fleet: haulage design implications for mine engineers
    Mining
    9 months ago

    XCMG–Fortescue ‘real zero’ fleet: haulage design implications for mine engineers

    XCMG Group and Fortescue have unveiled early prototypes of “real zero” mining fleet equipment, signalling progress towards fully decarbonised haulage and ancillary machinery across Fortescue’s iron ore operations. The collaboration is targeting battery-electric and potentially hydrogen-powered platforms sized for ultra-class haul trucks and large loaders, aiming to integrate with existing pit infrastructure and high-capacity charging or refuelling systems. For mine planners and engineers, the move points to future requirements for redesigned haul profiles, power distribution, and maintenance regimes tailored to zero-emission drivetrains.

    Tivan’s Speewah fluorite resource: design and logistics notes for mine planners
    Mining
    9 months ago

    Tivan’s Speewah fluorite resource: design and logistics notes for mine planners

    Tivan Limited has upgraded the mineral resource estimate for its Speewah fluorite project in Western Australia’s Kimberley region, describing the deposit as “globally significant” and strategically important for fluorine-based chemicals and aluminium production. The Speewah project, already known for its vanadium-titanium-iron mineralisation, now gains added value from a large, higher-confidence fluorite inventory within the existing mining lease. For geotechnical and mine planners, the combined polymetallic resource raises the stakes for integrated pit design, processing flowsheets and long-term infrastructure planning in a remote, high-cost logistics environment.

    Antipa’s Fiama lode discovery: design and pit optimisation notes for mine planners
    Mining
    9 months ago

    Antipa’s Fiama lode discovery: design and pit optimisation notes for mine planners

    Antipa Minerals has reported a major discovery at its Minyari gold–copper project in Western Australia, with drilling at the newly defined Fiama lode returning multiple high‑grade gold intercepts. The lode sits within the Paterson Province, where existing deposits such as Minyari and WACA already host significant near‑surface sulphide mineralisation amenable to open‑pit and potential underground development. The discovery points to further resource growth potential around existing infrastructure, with implications for pit shell optimisation, underground access design and future processing plant sizing.

    WA vanadium royalty cap: project cost certainty explained for engineers
    Policy
    9 months ago

    WA vanadium royalty cap: project cost certainty explained for engineers

    Western Australia has moved to cap the royalty rate for vanadium products at 5 per cent of the realised value, giving long-term fiscal certainty to developers in a state that hosts the world’s largest share of economic demonstrated vanadium resources. The decision is aimed at projects such as the Australian Vanadium Project near Meekatharra and Technology Metals Australia’s Murchison Technology Metals Project, both targeting vanadium pentoxide for steel alloys and grid-scale vanadium redox flow batteries. For geotechnical and civil teams, the clearer cost base may accelerate approvals, detailed design and construction scheduling for associated open pits, tailings storage and processing plants.

    Sunrise US critical minerals reserve bid: offtake and HPAL notes for engineers
    Mining
    9 months ago

    Sunrise US critical minerals reserve bid: offtake and HPAL notes for engineers

    Sunrise Energy Metals is positioning its Sunrise nickel–cobalt–scandium project in New South Wales to supply the newly announced US strategic critical minerals reserve, targeting long-term offtake into the American defence and clean energy supply chain. The laterite project is designed around high-pressure acid leach (HPAL) processing of nickel and cobalt, with scandium oxide as a key by-product for high-strength aluminium alloys in aerospace and automotive applications. Any US reserve participation would likely require binding offtake contracts, compliance with US sourcing rules, and investment in export logistics from eastern Australia.

    Momentum Technologies dual-track US REE processing: design and scale-up notes for engineers
    Mining
    9 months ago

    Momentum Technologies dual-track US REE processing: design and scale-up notes for engineers

    Momentum Technologies is commissioning what it claims is the world’s first dual-track demonstration plant near Dallas able to process both rare earth elements and lithium-ion battery materials using its proprietary membrane solvent extraction (MSX) system. MSX replaces football-field-scale solvent extraction circuits and kerosene with compact membrane reactors operating at moderate temperature and pressure, designed to cut footprint, energy use and time-to-commission for REE and battery-material refineries. The company is also progressing a 2,000 t/y commercial battery materials plant in Ohio and says its technology could ultimately support 20–50% of US rare earth processing capacity.

    Epiroc MT65 S trucks at Pucobre: haulage design and fleet renewal notes for engineers
    Mining
    9 months ago

    Epiroc MT65 S trucks at Pucobre: haulage design and fleet renewal notes for engineers

    Delivery of five 65 t class Epiroc Minetruck MT65 S units to Pucobre’s Tierra Amarilla operations in Chile’s Atacama Region marks the start of a 22-truck underground fleet renewal programme. The high-capacity trucks will operate in Pucobre’s narrow-vein copper mines, where ramp geometry, ground conditions and ventilation constraints make payload-to-power ratios and braking performance critical. For mine planners and maintenance teams, the staged introduction allows progressive optimisation of haul profiles, workshop layouts and spares strategies around a single, standardised 65 t truck platform.

    FLS appoints Toni Laaksonen as CEO: service-led focus for mine project teams
    Mining
    9 months ago

    FLS appoints Toni Laaksonen as CEO: service-led focus for mine project teams

    FLSmidth has appointed Toni Laaksonen as CEO with immediate effect, elevating him from his role as Service Business Line President, which he assumed in June 2025. He replaces Mikko Keto, who notified the Board in November 2025 of his decision to leave for an external opportunity. The move places a service-focused leader in charge of the OEM at a time when miners are prioritising brownfield optimisation, aftermarket support and performance-based service contracts for grinding, flotation and digital process equipment.

    Hägglunds Mellansel hydraulics lab: drive system insights for bulk mine handling
    Mining
    9 months ago

    Hägglunds Mellansel hydraulics lab: drive system insights for bulk mine handling

    Hägglunds, part of Bosch Rexroth, has opened a new hydraulics laboratory in Mellansel, Sweden to develop and test its hydraulic direct drive systems used on large apron feeders, bucketwheel reclaimers and conveyors. The lab focuses on integrated systems comprising a hydraulic motor, flexibly placed drive unit and dedicated control and monitoring system, allowing optimisation of torque control and start-up behaviour under high-load, low-speed conditions typical in bulk materials handling. For mine operators and designers, the facility should accelerate validation of drive configurations for retrofit and greenfield projects, particularly where variable-speed, stall-resistant drives are critical.

    ABB System 800xA 7.0 DCS: migration and integration notes for mine control teams
    Mining
    9 months ago

    ABB System 800xA 7.0 DCS: migration and integration notes for mine control teams

    ABB has released ABB Ability System 800xA 7.0, a new generation DCS aimed at “modernisation without disruption” for continuous-process sites such as concentrators, refineries and smelters. The platform is designed to let operators retain existing controllers and I/O while upgrading servers, clients and networking, supporting mixed-version architectures so brownfield plants can phase in new functionality. For mining engineers, the key gains are tighter integration of process control, electrical and safety systems and a clearer migration path for ageing 800xA installations without extended shutdowns.

    Bosch Rexroth–Xi'an IF JV: electromechanical actuators explained for mine engineers
    Mining
    9 months ago

    Bosch Rexroth–Xi'an IF JV: electromechanical actuators explained for mine engineers

    Bosch Rexroth has signed a joint venture agreement with Xi'an IF Intelligent Equipment to develop and sell electromechanical actuators (EMA) for off‑highway vehicles in global mining and construction markets. The partnership combines Bosch Rexroth’s automation and drive technology portfolio, including high‑power linear and rotary actuators, with Xi'an IF’s local manufacturing base as a 100% subsidiary of Xi'an Huaou in China, where Bosch Rexroth has operated since 1978. For mine operators, the move signals wider availability of electric actuation options for haul trucks and loaders, supporting hydraulic‑to‑electromechanical retrofits and new OEM platforms.

    Dairy Supply Chain Road upgrades: pavement design and drainage notes for engineers
    Infrastructure
    9 months ago

    Dairy Supply Chain Road upgrades: pavement design and drainage notes for engineers

    Upgrades are progressing on the Dairy Supply Chain Road in south‑west Victoria, with federal and state funding targeting six kilometres of priority links on Cobden–Stonyford Road, Bullaharre and Princes Highway West in Australia’s largest dairy production area. Works are expected to focus on pavement strengthening, resurfacing and localised geometry improvements to better handle heavy milk tanker traffic and reduce rutting and edge break on these rural freight routes. For civil and pavement engineers, the programme signals continued demand for heavy‑duty flexible pavements and robust drainage detailing on high-axle-load agricultural corridors.

    Northern Highway–Watson Street upgrades: design and staging notes for engineers
    Infrastructure
    9 months ago

    Northern Highway–Watson Street upgrades: design and staging notes for engineers

    Road upgrades at the Northern Highway (High Street) and Watson Street intersection in Wallan will add extra lanes on the Northern Highway in both directions to cut congestion and improve safety on this key north Melbourne arterial. The jointly funded Federal–Victorian project targets a known bottleneck on the Hume Freeway approach, where turning movements and short stacking lengths currently constrain peak-hour flow. Designers and contractors can expect works focused on widening, new lane markings and signal phasing changes, with implications for pavement design, drainage adjustments and traffic management staging.

    MMD semi-mobile sizer stations for rare earths: haulage and energy gains for mine engineers
    Mining
    9 months ago

    MMD semi-mobile sizer stations for rare earths: haulage and energy gains for mine engineers

    Growing demand, complex geology and shifting rare earth supply chains are driving miners to adopt MMD Group’s semi-mobile sizer stations at the pit rim instead of conventional truck-and-shovel haulage to fixed crushers. The sizers’ low roll speed and self-cleaning tooth design handle wet, sticky and variable ore, reducing fines and blockages while maintaining consistent product size for downstream flotation or leaching circuits. Relocatable units on crawlers or skids allow progressive pit advance, cutting haul distances, trimming energy use and limiting the footprint of permanent crushing infrastructure.

    Glencore’s First Nations pathway programme: workforce planning notes for mine operators
    Mining
    9 months ago

    Glencore’s First Nations pathway programme: workforce planning notes for mine operators

    Glencore Coal has launched a First Nations pathway programme across its Australian coal operations, targeting roles in underground and open-cut mines, CHPPs and rail logistics. The initiative is focused on structured traineeships and apprenticeships in trades such as diesel fitting, electrical maintenance and plant operations, supported by on-site mentoring and culturally safe recruitment processes. For mine operators and contractors in Glencore’s supply chain, the programme signals stronger expectations around Indigenous participation in technical roles and long-term workforce planning.

    • Previous
    • 1
    • More pages289
    • 290
    • 291
    • More pages365
    • Next
    AllGeotechnicalInfrastructureHazardsEnvironmental