Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Standard/Guideline
    Sustainability

    WA government–industry alignment for 2026: permitting and design notes for engineers

    December 17, 2025|

    Reviewed by Tom Sullivan

    WA government–industry alignment for 2026: permitting and design notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Collaboration between Western Australian mining industry bodies and local government is being strengthened ahead of 2026 to manage shifting regulatory, workforce and infrastructure demands. Stakeholders are aligning on issues such as approvals timeframes for new pits and tailings facilities, skills pipelines for autonomous haulage and remote operations centres, and long-term planning for regional roads and power networks servicing major iron ore and lithium hubs. For engineers, closer coordination could mean clearer permitting pathways, more predictable infrastructure funding, and earlier input into standards affecting pit design, waste storage and closure obligations.

    Technical Brief

    • Industry bodies are working directly with WA local governments rather than only via state-level departments.
    • Policy alignment is being framed around multi-decade mine life and closure obligations, not single approvals.
    • For similar jurisdictions, the WA process offers a template for synchronising mine design and regional planning.

    Our Take

    Western Australia dominates our Policy coverage within Australia, and 2026-dated pieces often relate to staged implementation of new standards, so operators should assume multi‑year compliance ramps rather than one‑off rule changes.

    Among the 46 Policy stories in our database, those tagged with both ‘Standard/Guideline’ and ‘Sustainability’ frequently precede tighter project approvals, suggesting WA proponents may face more prescriptive ESG conditions on new and expanded projects by 2026.

    Because this is framed at the state level rather than by commodity or asset, it signals that any WA project pipeline updates through 2026 will likely need to reference these aligned government–industry frameworks in their feasibility and permitting strategies.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Ontario–Ottawa ‘one project, one review’ deal: permitting lens for mine planners
    Policy
    about 9 hours ago

    Ontario–Ottawa ‘one project, one review’ deal: permitting lens for mine planners

    Ontario and Canada have signed a “one project, one review” agreement to coordinate federal and provincial environmental and impact assessments, targeting long-delayed mining and infrastructure schemes in the Ring of Fire and other critical mineral districts. The deal dovetails with Ontario’s One Project, One Process (1P1P) framework, which aims to cut mine approval timelines from up to 15 years to a maximum of two years, with Frontier Lithium’s PAK project the first pilot. For geotechnical and mining teams, the move signals materially shorter permitting horizons for cobalt, lithium, nickel and copper projects backed by a C$500 million processing fund.

    Planning and Infrastructure Act: key consenting changes for project engineers
    Policy
    about 11 hours ago

    Planning and Infrastructure Act: key consenting changes for project engineers

    The Planning and Infrastructure Act has received Royal Assent, bringing into force a wide package of reforms aimed at accelerating housing delivery and major infrastructure consenting across the UK. Measures include streamlining Development Consent Order processes for nationally significant projects and tightening statutory timescales for planning decisions, with the intention of reducing multi‑year delays on large transport, energy and water schemes. For engineers, the changes signal pressure to front‑load design, environmental assessment and geotechnical risk work to meet shorter pre‑construction and examination windows.

    Brazil delays critical minerals areas auction: project pipeline risks for mine planners
    Policy
    about 11 hours ago

    Brazil delays critical minerals areas auction: project pipeline risks for mine planners

    Brazil has indefinitely postponed a planned March 2026 auction of mineral exploration areas rich in critical minerals after the National Mining Agency (ANM) said it lacks funds to cover embedded auction costs. The tender was to be the first mining round run jointly with B3, the São Paulo stock exchange operator, using a bidding model already applied in power and oil and gas, and would have addressed a backlog of roughly 100,000 areas awaiting auction. The delay jars with Brazil’s push to market its 94% share of global niobium reserves and significant graphite, nickel, lithium and rare earth potential.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.