Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Victory’s rare earths pilot plant: flowsheet and scale‑up insights for engineers

    June 18, 2026|

    Reviewed by Tom Sullivan

    Victory’s rare earths pilot plant: flowsheet and scale‑up insights for engineers

    First reported on Australian Mining

    30 Second Briefing

    Victory Metals has commissioned a rare earths pilot processing plant in Perth to advance flowsheet development for its North Stanmore heavy rare earth project, with the facility officially opened by Federal Resources Minister Madeleine King. The plant will test beneficiation and hydrometallurgical routes on North Stanmore ore to de-risk scale-up to a commercial concentrator and refinery. For process and project engineers, pilot data from this facility will drive decisions on reagent regimes, impurity management and potential downstream separation capacity in Western Australia.

    Technical Brief

    • Pilot plant is located in Perth, enabling testwork close to Western Australian engineering and reagent suppliers.
    • North Stanmore is a heavy rare earths project, implying focus on Dy, Tb and other magnet-critical elements.

    Our Take

    The pilot processing plant at North Stanmore comes soon after Victory Metals’ Native Title Mining Agreement with the Wajarri Yamaji Aboriginal Corporation, signalling that community and tenure risks are being addressed in parallel with technical scale‑up.

    Victory Metals’ acceptance into the US Defense Industrial Base Consortium, tied to the same North Stanmore rare earths project, positions this Perth-based developer to target defence-linked offtake channels once pilot plant data underpins product qualification.

    Our database shows relatively few heavy rare earth project stories within the 1195 Mining pieces, so North Stanmore’s sequence of metallurgical breakthroughs and now a pilot plant suggests it is emerging as one of the more advanced clay-hosted HREE plays in Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Global manganese reshuffle: supply and alloy trade shifts for mine planners
    Mining
    about 1 hour ago

    Global manganese reshuffle: supply and alloy trade shifts for mine planners

    African export bans and new smelting plans are reshaping manganese flows, with Gabon and Ghana moving to restrict raw ore exports by 2029–2030 while Gabon pursues coastal alloy capacity at Moanda with Eramet and entertains proposals from Chinese producer Inner Mongolia Xinchuang for two local plants. India, which imported 4.34 Mt of South African ore in 2025 and exported 1.25 Mt of silicomanganese, risks being squeezed between tighter African ore supply and Gabonese alloy competing in key markets such as Italy and Japan. OM Holdings’ exit from South Africa’s Tshipi mine while securing offtake from both Tshipi and Australia’s Butcherbird illustrates how traders and alloy producers are shifting from mine ownership to controlling marketing and processing routes.

    Entrée–Mongolia Oyu Tolgoi deal by 2027: development and planning notes for engineers
    Mining
    about 1 hour ago

    Entrée–Mongolia Oyu Tolgoi deal by 2027: development and planning notes for engineers

    Entrée Resources and the Mongolian government have set 31 March 2027 as a target to resolve whether Mongolia takes up to a 34% stake in Entrée LLC, which holds the Shivee Tolgoi and Javkhlant licences critical to underground development of the Hugo North Extension at Oyu Tolgoi. Oyu Tolgoi LLC, 34% owned by Mongolia and 66% by Rio Tinto, cannot resume lateral development on Shivee Tolgoi—paused after about 230 equivalent metres—until the licences are transferred and tax payment certificates issued. New underground drilling at Hugo North Extension includes hole UGD1025A with 125.3 m at 1.28% Cu, 0.27 g/t Au and 3.18 g/t Ag from 362.7 m, feeding into an updated technical report and revised mine plan targeted for Q1 2027.

    Barrick mine managers gain target control: planning and cost notes for engineers
    Mining
    about 1 hour ago

    Barrick mine managers gain target control: planning and cost notes for engineers

    Barrick Mining is pushing mine-level accountability after years of missed three-year production forecasts, giving site managers greater control over guidance while preparing an IPO of American Barrick Gold, which will hold Nevada Gold Mines, Fourmile and Pueblo Viejo. International CEO Sebastiaan Bock reports Barrick International has met or exceeded production guidance for seven consecutive years, expects 2026 copper AISC slightly above US$3.75/lb after a Q3 spike to US$4.52/lb driven by diesel, FX, royalties and waste stripping, and has invested over US$90 million in safety technology with 24,000+ critical control verifications in Q3. Key project levers for engineers are Lumwana’s expansion, with all major long-lead items procured and the mill building on the critical path for first copper in Q1 2028, and the Reko Diq build-out, now paced by security conditions and a yet-to-be-finalised capital and financing plan due for update by mid-2027.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental