Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Victory’s rare earths pilot plant: flowsheet and scale‑up insights for engineers

    June 18, 2026|

    Reviewed by Tom Sullivan

    Victory’s rare earths pilot plant: flowsheet and scale‑up insights for engineers

    First reported on Australian Mining

    30 Second Briefing

    Victory Metals has commissioned a rare earths pilot processing plant in Perth to advance flowsheet development for its North Stanmore heavy rare earth project, with the facility officially opened by Federal Resources Minister Madeleine King. The plant will test beneficiation and hydrometallurgical routes on North Stanmore ore to de-risk scale-up to a commercial concentrator and refinery. For process and project engineers, pilot data from this facility will drive decisions on reagent regimes, impurity management and potential downstream separation capacity in Western Australia.

    Technical Brief

    • Pilot plant is located in Perth, enabling testwork close to Western Australian engineering and reagent suppliers.
    • North Stanmore is a heavy rare earths project, implying focus on Dy, Tb and other magnet-critical elements.

    Our Take

    The pilot processing plant at North Stanmore comes soon after Victory Metals’ Native Title Mining Agreement with the Wajarri Yamaji Aboriginal Corporation, signalling that community and tenure risks are being addressed in parallel with technical scale‑up.

    Victory Metals’ acceptance into the US Defense Industrial Base Consortium, tied to the same North Stanmore rare earths project, positions this Perth-based developer to target defence-linked offtake channels once pilot plant data underpins product qualification.

    Our database shows relatively few heavy rare earth project stories within the 1195 Mining pieces, so North Stanmore’s sequence of metallurgical breakthroughs and now a pilot plant suggests it is emerging as one of the more advanced clay-hosted HREE plays in Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners
    Mining
    about 11 hours ago

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners

    Hertha Metals has broken ground on its $100 million Hertha Chalyx plant in Conroe, Texas, designed to produce about 10,000 tonnes per year of combined steel-grade and magnet-grade high-purity iron using domestic ore from Minnesota’s Iron Range and Texas natural gas. The facility, adjacent to the Pi100 pilot plant where 99.95% purity was achieved in August, will scale Hertha’s FLEXHERS process, which couples electric arc furnace technology with natural gas or hydrogen. First magnet-grade output is targeted for early 2028, feeding US NdFeB magnet makers that currently rely on China for an estimated 94% of high-purity iron.

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners
    Mining
    about 11 hours ago

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners

    PC Gold has identified a new high-grade North Link zone immediately north of the existing mineral resource estimate at its Spring Hill gold project in the Northern Territory, based on recent reverse-circulation drilling targeting mineralisation extensions. The North Link structure is interpreted to connect with known lodes within the current MRE footprint, potentially extending strike continuity and adding shallow, open-pittable ounces. For mine planners and geotechs, the result signals a need to revisit pit shell optimisation, geotechnical domains and slope design north of the present resource limits.

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners
    Mining
    about 11 hours ago

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners

    Horizon Gold has reported its strongest intercept yet at the Snook prospect within the Gum Creek project in Western Australia, with reverse-circulation drilling returning 44m at 5.08g/t gold from 145m, including 11m at 16.30g/t from 174m. The thick, high-grade zone at moderate depth points to a larger open pit shell and supports evaluation of underground mining scenarios beneath any eventual pit floor. For mine planners and geotechs, the result justifies updated pit optimisations, geotechnical domain modelling and closer-spaced drilling to refine continuity and rock mass conditions.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental