Barrick mine managers gain target control: planning and cost notes for engineers
Reviewed by Tom Sullivan

First reported on MINING.com
30 Second Briefing
Barrick Mining is pushing mine-level accountability after years of missed three-year production forecasts, giving site managers greater control over guidance while preparing an IPO of American Barrick Gold, which will hold Nevada Gold Mines, Fourmile and Pueblo Viejo. International CEO Sebastiaan Bock reports Barrick International has met or exceeded production guidance for seven consecutive years, expects 2026 copper AISC slightly above US$3.75/lb after a Q3 spike to US$4.52/lb driven by diesel, FX, royalties and waste stripping, and has invested over US$90 million in safety technology with 24,000+ critical control verifications in Q3. Key project levers for engineers are Lumwana’s expansion, with all major long-lead items procured and the mill building on the critical path for first copper in Q1 2028, and the Reko Diq build-out, now paced by security conditions and a yet-to-be-finalised capital and financing plan due for update by mid-2027.
Technical Brief
- Leaders conducted over 24,000 in-field critical control verifications in Q3, resolving 79% of at-risk conditions immediately.
- Recordable injury frequency is trending down, but severity of incidents remains the main safety challenge.
- More than US$90 million has been deployed into safety technology: automation, vehicle monitoring, reporting software and AI analytics.
- TRIFR and lost-time injury frequency will be the primary quantitative safety KPIs reported quarterly from 2027.
- At Lumwana, a mill reline brought forward to late September deferred higher-grade ore and reduced Q3 copper output from 56,000 to 50,000 tonnes.
Our Take
Barrick Mining’s move to give mine managers more say on targets comes as it prepares a North American IPO vehicle for assets such as Nevada Gold Mines and Pueblo Viejo, so stronger site-level performance discipline could be aimed at underpinning valuation ahead of that spin-out, as flagged in the November 2026 IPO coverage.
With copper all-in sustaining costs running above the company’s own guidance range, the emphasis on local decision-making at operations like Lumwana and the Reko Diq copper-gold project likely reflects pressure to tighten cost control at the pit and plant level rather than via purely corporate mandates.
Our database shows relatively few ‘Projects + Safety’ pieces that also involve large, multi-region portfolios like Barrick’s spread across Tanzania, Zambia, Pakistan and the Americas, suggesting the company is using safety technology investment and devolved authority as a common operating framework across very different regulatory and cultural environments.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


