Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Op-Ed
    Sustainability

    US scrap rules: processing bottlenecks and security ratio for engineers

    August 24, 2026|

    Reviewed by Tom Sullivan

    US scrap rules: processing bottlenecks and security ratio for engineers

    First reported on MINING.com

    30 Second Briefing

    US export restrictions taking effect later in August will force some lithium-ion battery scrap, including black mass, and tungsten scrap to be sold to US buyers, but GEM Mining Consulting’s Alina Karpunina argues supply security hinges on how much of this material is actually converted into qualified secondary minerals. DOE data show a 2023 US mismatch, with intermediate facilities able to process nearly 175,000 tons of batteries and scrap, but only about 35,500 tons of battery-material recovery capacity and 76,000 tons more merely planned. Karpunina proposes a “scrap-to-security conversion ratio” based on contained critical-mineral units recovered to customer specification, warning that export controls without robust domestic processing risk idle feedstock and continued reliance on primary mining.

    Technical Brief

    • GEM’s “recoverable strategic supply” framework requires scrap to clear five hurdles from availability to qualification.
    • GEM’s proposed “scrap-to-security conversion ratio” uses contained critical-mineral units meeting spec divided by retained units.
    • Lack of harmonised US datasets tracking metal-content flows through collection, pre-treatment, recovery and qualification blocks ratio calculation.

    Our Take

    The 68% ‘scrap-to-security’ conversion ratio used here mirrors GEM Mining Consulting’s separate finding that only around two‑thirds of headline lithium supply is truly usable to 2035, underlining that processing losses and off‑spec output are now a systemic constraint across critical minerals rather than a niche recycling issue.

    In another recent GEM policy piece on processing bottlenecks, sulphuric acid supply and plant throughput – not ore – were flagged as likely triggers of the next supply shock for copper, nickel and graphite; the US rules on lithium‑ion battery scrap and tungsten scrap therefore risk tightening an already fragile mid‑stream for these same commodities if domestic plants underperform.

    Within our 127 Policy stories, relatively few focus on tungsten compared with lithium and copper, so the note that US tungsten mining ceased in 2015 while seven domestic processors remain suggests future US security-of-supply debates may pivot from new mines to securing long‑term scrap and concentrate feed for this small group of converters.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    NSW uranium ban challenge: what renewed voter backing means for project teams
    Policy
    about 16 hours ago

    NSW uranium ban challenge: what renewed voter backing means for project teams

    New polling of 1000 New South Wales voters shows 67 per cent would back lifting the state’s uranium mining ban if projects demonstrably cut emissions, giving the Minerals Council of Australia fresh leverage to push for legislative change. The MCA is linking support to nuclear power and pointing to near‑border assets such as Boss Energy’s Honeymoon in‑situ leach operation, about 80km inside South Australia, as evidence NSW is forgoing investment. Any repeal would open large sandstone basins to exploration but trigger stricter radiation, tailings and groundwater controls.

    UK–US AI fusion agreements: design and modelling takeaways for engineers
    Policy
    1 day ago

    UK–US AI fusion agreements: design and modelling takeaways for engineers

    UK and US governments are signing two agreements to accelerate commercial nuclear fusion development by combining national expertise in artificial intelligence and high‑performance computing. The pacts are expected to support faster optimisation of plasma confinement and reactor control algorithms, and to improve simulation of tokamak and stellarator designs that currently demand exascale‑class computing. For civil and nuclear engineers, this signals future design programmes where structural, thermal and neutronic load cases for fusion plants are iterated rapidly using shared AI‑driven modelling frameworks.

    Junior explorer CGT protection push: funding and project risk lens for engineers
    Policy
    1 day ago

    Junior explorer CGT protection push: funding and project risk lens for engineers

    Australian mining bodies are urging the Federal Government to extend capital gains tax (CGT) concessions to junior mineral explorers, matching relief already available to tech and other start-up sectors. The Minerals Council of Australia and the Association of Mining and Exploration Companies warn proposed CGT changes could deter high-risk greenfields exploration, particularly for early-stage ASX-listed juniors reliant on equity raisings. Industry groups argue that without tailored CGT treatment, pre-discovery investors may exit earlier and reduce funding for drilling campaigns and resource definition.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental