Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    UK Mining Conference: critical minerals, permitting and skills takeaways for engineers

    June 17, 2026|

    Reviewed by Tom Sullivan

    UK Mining Conference: critical minerals, permitting and skills takeaways for engineers

    First reported on International Mining – News

    30 Second Briefing

    UK Mining Conference delegates in Cornwall set out how domestic resources such as Cornish lithium, Scottish barite and Welsh copper could reduce UK reliance on imported critical minerals amid volatile markets and geopolitical risk. Speakers linked subsurface datasets from the British Geological Survey with AI-driven targeting for deep exploration, and discussed permitting, ESG scrutiny and grid constraints as key barriers to new mines and processing plants. Panels also focused on skills, using school outreach, virtual reality mine tours and apprenticeships to attract young people into geoscience and mining engineering.

    Technical Brief

    • ESG scrutiny identified as extending beyond mine sites to haulage corridors, ports and downstream refining footprints.

    Our Take

    International Mining also features as an organiser and media presence around the World Mining Congress 2026 in Peru, signalling that the UK Mining Conference sits within a broader effort to convene global decision‑makers on metals and critical minerals strategy.

    The sustainability tag aligns this UK metals and minerals discussion with items such as Boliden’s European ‘green fleets’ rollout, indicating that any domestic UK critical minerals push will likely be judged against emerging low‑emission benchmarks in established copper, nickel and zinc operations.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners
    Mining
    about 12 hours ago

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners

    Hertha Metals has broken ground on its $100 million Hertha Chalyx plant in Conroe, Texas, designed to produce about 10,000 tonnes per year of combined steel-grade and magnet-grade high-purity iron using domestic ore from Minnesota’s Iron Range and Texas natural gas. The facility, adjacent to the Pi100 pilot plant where 99.95% purity was achieved in August, will scale Hertha’s FLEXHERS process, which couples electric arc furnace technology with natural gas or hydrogen. First magnet-grade output is targeted for early 2028, feeding US NdFeB magnet makers that currently rely on China for an estimated 94% of high-purity iron.

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners
    Mining
    about 12 hours ago

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners

    PC Gold has identified a new high-grade North Link zone immediately north of the existing mineral resource estimate at its Spring Hill gold project in the Northern Territory, based on recent reverse-circulation drilling targeting mineralisation extensions. The North Link structure is interpreted to connect with known lodes within the current MRE footprint, potentially extending strike continuity and adding shallow, open-pittable ounces. For mine planners and geotechs, the result signals a need to revisit pit shell optimisation, geotechnical domains and slope design north of the present resource limits.

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners
    Mining
    about 12 hours ago

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners

    Horizon Gold has reported its strongest intercept yet at the Snook prospect within the Gum Creek project in Western Australia, with reverse-circulation drilling returning 44m at 5.08g/t gold from 145m, including 11m at 16.30g/t from 174m. The thick, high-grade zone at moderate depth points to a larger open pit shell and supports evaluation of underground mining scenarios beneath any eventual pit floor. For mine planners and geotechs, the result justifies updated pit optimisations, geotechnical domain modelling and closer-spaced drilling to refine continuity and rock mass conditions.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental