Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners

    October 13, 2026|

    Reviewed by Tom Sullivan

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners

    First reported on Australian Mining

    30 Second Briefing

    PC Gold has identified a new high-grade North Link zone immediately north of the existing mineral resource estimate at its Spring Hill gold project in the Northern Territory, based on recent reverse-circulation drilling targeting mineralisation extensions. The North Link structure is interpreted to connect with known lodes within the current MRE footprint, potentially extending strike continuity and adding shallow, open-pittable ounces. For mine planners and geotechs, the result signals a need to revisit pit shell optimisation, geotechnical domains and slope design north of the present resource limits.

    Technical Brief

    • Reverse-circulation drilling was used, implying dry sampling and good chip recovery in oxidised profiles.
    • Additional RC drilling is likely required to define true thickness, dip continuity and grade distribution.

    Our Take

    PC Gold’s recent appointment of former Red Back Mining president Richard Clark to its board, as noted in our 6 October item, suggests the company is gearing up to move the Spring Hill gold project from pure discovery towards feasibility and development decisions.

    Within our 425 gold‑keyword pieces, Northern Territory projects like Spring Hill appear far less frequently than Western Australian gold stories, implying that any high‑grade discovery here could attract outsized attention from Australian-focused investors and contractors.

    For a junior such as PC Gold operating in Australia, the current industry push (covered in our 14 September piece) to extend CGT concessions to explorers would, if adopted, make it easier to raise risk capital for follow‑up drilling and early studies around new high‑grade zones at Spring Hill.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners
    Mining
    about 2 hours ago

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners

    Hertha Metals has broken ground on its $100 million Hertha Chalyx plant in Conroe, Texas, designed to produce about 10,000 tonnes per year of combined steel-grade and magnet-grade high-purity iron using domestic ore from Minnesota’s Iron Range and Texas natural gas. The facility, adjacent to the Pi100 pilot plant where 99.95% purity was achieved in August, will scale Hertha’s FLEXHERS process, which couples electric arc furnace technology with natural gas or hydrogen. First magnet-grade output is targeted for early 2028, feeding US NdFeB magnet makers that currently rely on China for an estimated 94% of high-purity iron.

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners
    Mining
    about 2 hours ago

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners

    Horizon Gold has reported its strongest intercept yet at the Snook prospect within the Gum Creek project in Western Australia, with reverse-circulation drilling returning 44m at 5.08g/t gold from 145m, including 11m at 16.30g/t from 174m. The thick, high-grade zone at moderate depth points to a larger open pit shell and supports evaluation of underground mining scenarios beneath any eventual pit floor. For mine planners and geotechs, the result justifies updated pit optimisations, geotechnical domain modelling and closer-spaced drilling to refine continuity and rock mass conditions.

    Larvotto high-grade at Hillgrove Metz: underground potential and drilling notes for engineers
    Mining
    about 2 hours ago

    Larvotto high-grade at Hillgrove Metz: underground potential and drilling notes for engineers

    Larvotto Resources has reported high-grade gold–antimony–tungsten intercepts from four lodes at the Metz Mining Centre within its Hillgrove project in New South Wales, including a newly identified lode named Echidna. Key results include 20.5m at 9.4g/t gold equivalent (AuEq) from 342.5m at Blacklode, with a higher-grade core of 6.2m at 27.2g/t AuEq from the same depth. The grades and depths point to underground mining potential and support further resource definition drilling targeting multi-commodity sulphide mineralisation.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental