Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Product
    Projects

    Tutt Bryant Equipment model: capex and fleet planning lessons for contractors

    February 11, 2026|

    Reviewed by Tom Sullivan

    Tutt Bryant Equipment model: capex and fleet planning lessons for contractors

    First reported on Australian Mining

    30 Second Briefing

    Tutt Bryant Equipment is using long-term partnerships, flexible finance and tailored fleet planning to grow contractors such as Cooper Civil & Crushing, which has just added a Jonsson L120-330 double crusher to its mobile plant. The distributor supports customers from initial machine selection through to parts, service and rebuilds across loaders, crushers, screens and articulated dump trucks, reducing downtime on remote mining and quarry sites. For geotechnical and mining contractors, the model shifts capex towards scalable hire–purchase mixes while standardising support across mixed OEM fleets.

    Technical Brief

    • Jonsson L120-330 double crusher adds dual-stage primary–secondary crushing in a single tracked unit.

    Our Take

    Jonsson appears in both this Tutt Bryant Equipment piece and the recent UK-focused Agg-Pro/Arjes dealer article (10 Feb 2026), signalling that Jonsson’s crushing and screening brand is being pushed through multiple regional dealer networks rather than a single global distributor model.

    Within our 1892 tag-matched Product/Projects items, Australia often features as a test-bed for heavy crushing gear, so Tutt Bryant’s promotion of the Jonsson L120–330 configuration is likely aimed at quarry and contract-crushing operators looking to standardise fleets around higher-capacity mobile units.

    The emphasis on a specific double-crusher model (L120–330) suggests Tutt Bryant is targeting mid-to-large civil and crushing contractors such as Cooper Civil & Crushing that need scalable plant, rather than the small owner-operator segment typically served by lighter tracked jaws and cones.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 12 hours ago

    Boliden Somincor–EDP–Greenvolt solar UPAC: integration notes for Neves‑Corvo mine engineers

    Boliden Somincor has partnered with EDP and Greenvolt to build Portugal’s largest self‑consumption solar generation unit (UPAC) near the Neves‑Corvo zinc mine at Castro Verde, supplying power directly to mine operations. The distributed solar plant will sit adjacent to one of Europe’s largest zinc orebodies, reducing grid dependence for high‑load processes such as hoisting, ventilation and paste backfill plants. For mine planners and electrical engineers, the project signals growing integration of large‑scale on‑site renewables into base‑metal underground operations in southern Europe.

    Mining
    about 16 hours ago

    Aramine AutoNav Tele loader at Reward Gold mine: design and safety notes for planners

    RCT – Powered by Epiroc’s AutoNav Tele automation has been fitted to an Aramine L350D loader to support narrow vein stoping at Vertex Minerals’ Reward Gold mine at Hill End, after the unit was commissioned through Epiroc’s Orange Service Centre in New South Wales. The compact L350D, designed for ultra-narrow headings, is now operated via tele-remote AutoNav control rather than line-of-sight, allowing tramming and loading in constrained drives. For geotechnical and mine planners, this enables extraction in thinner ore lenses while keeping operators out of unsupported ground.

    Mining
    about 17 hours ago

    Bosch Rexroth–MEDATech off‑highway electrification: integration notes for mine engineers

    Bosch Rexroth is partnering with MEDATech Engineering to deliver end‑to‑end electrification packages for off‑highway and mining mobile equipment, combining Rexroth’s mobile hydraulics, inverters and controls with MEDATech’s EV drivetrain integration capability. The collaboration targets full systems from componentry and software through to application‑specific design and build, aimed at OEMs and retrofit projects for haul trucks, loaders and other heavy units. For mine operators, this points to more standardised electric powertrain architectures and a clearer route to integrating high‑voltage drivetrains with existing hydraulic and control systems.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.