Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Thiess–Caterpillar 793D FLANDERS hybrid trial: key fleet lessons for mine engineers

    March 11, 2026|

    Reviewed by Tom Sullivan

    Thiess–Caterpillar 793D FLANDERS hybrid trial: key fleet lessons for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Thiess plans to retrofit a Caterpillar 793D haul truck with a FLANDERS hybrid diesel‑electric kit as part of its 2025 Sustainability Report roadmap, targeting lower emissions from ultra‑class fleets while acknowledging that net zero‑capable propulsion for large trucks is not yet commercially ready. The FLANDERS system, previously used to boost productivity and cut fuel burn on large excavators and drills, will be adapted to the 793D’s existing electric drive to recover and reuse braking energy. For mine operators, the trial offers a near‑term retrofit option to reduce diesel consumption and validate hybrid performance on a widely used 220–240 t class truck.

    Technical Brief

    • Project is embedded in Thiess’ 2025 Sustainability Report roadmap, providing a defined near-term deployment window.

    Our Take

    Thiess already features in several of our recent Mining items for autonomous haulage trials with EACON at Norton Gold Fields, so retrofitting a Caterpillar 793D with a FLANDERS hybrid kit signals the contractor is systematically testing multiple technology pathways across its truck fleet rather than backing a single OEM solution.

    Within our 2058 tag‑matched pieces on Projects/Product/Sustainability, Thiess appears repeatedly as a service provider rather than an asset owner, suggesting that successful hybrid retrofits on 793D trucks could quickly be offered as part of its broader contract mining toolkit to clients in coal and gold operations alike.

    The 2025 sustainability report context in this article aligns with Thiess’ recent contract extension at Mount Pleasant, indicating that demonstrating lower‑emission or more efficient truck fleets may be increasingly important for winning and extending long‑term mining services contracts in Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    From reactive to predictive mining safety: data and sensing priorities for engineers
    Mining
    about 3 hours ago

    From reactive to predictive mining safety: data and sensing priorities for engineers

    Mining safety specialist David Coghlan, head of technology and product at TURCK, argues that connected sensing and control must shift mines from reactive alarms to predictive intervention as fleets, conveyors and fixed plant become more automated. He points to integrated proximity detection, real-time location and condition monitoring on mobile equipment, tied into site-wide networks, as the basis for predicting collision and entrapment risks rather than just logging incidents. For geotechnical and operations teams, this means designing safety systems around data quality, latency and interoperability, not just compliance with existing guarding and lock-out procedures.

    Evolution becomes Carnaby’s largest shareholder: M&A and project signals for mine planners
    Mining
    about 3 hours ago

    Evolution becomes Carnaby’s largest shareholder: M&A and project signals for mine planners

    Evolution Mining has become Carnaby Resources’ largest shareholder with a 13.7 per cent stake after acquiring the QIC Queensland Critical Minerals Fund’s ~37.9 million Carnaby shares as part of its proposed $213 million takeover. Evolution also issued about 2.6 million new shares to QIC, signalling continued use of scrip-based structures in Australian mid-tier M&A. For copper–gold project developers, the move points to stronger strategic interest from established producers in advanced exploration portfolios rather than greenfield assets.

    Develop’s Woodlawn drilling: 15-year mine life implications for planners and geotechs
    Mining
    about 3 hours ago

    Develop’s Woodlawn drilling: 15-year mine life implications for planners and geotechs

    Develop Global’s latest underground drilling at the Woodlawn copper–zinc mine in New South Wales has returned intercepts grading up to 15.7 per cent copper equivalent (CuEq), supporting its Project DM15 plan to extend mine life from 10 to 15 years. The high-grade results, from step-out holes targeting depth extensions of existing lenses, suggest additional sulphide resources beyond the current reserve envelope. For mine planners and geotechs, this points to a longer stoping schedule, potential redesign of sequencing and backfill, and extended use of existing underground infrastructure.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental