Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Tether lifts Metalla Royalty & Streaming stake: portfolio notes for mine planners

    August 13, 2026|

    Reviewed by Joe Ashwell

    Tether lifts Metalla Royalty & Streaming stake: portfolio notes for mine planners

    First reported on MINING.com

    30 Second Briefing

    Tether International has lifted its stake in Metalla Royalty & Streaming to about 14%, buying 149,116 shares at US$9.14 each for US$1.36 million and taking its holding to 13.2 million shares out of 93.5 million outstanding. Metalla’s nearly 100 royalties and streams include a 1.5% royalty over part of Iamgold’s Côté gold mine and the Gosselin deposit in Ontario, plus exposure to First Quantum’s Taca Taca and Hudbay’s Copper World projects. The move extends Tether’s 2025–26 strategy of shifting crypto-derived capital into gold-linked royalties, alongside its 32% stake in Elemental Altus and more than 146 tonnes of physical gold.

    Technical Brief

    • Early-warning disclosure was triggered once Tether’s post-June purchases exceeded 2% of Metalla’s outstanding shares.
    • Metalla’s 1.5% royalty covers part of Iamgold’s Côté mine plus the entire Gosselin deposit footprint.
    • Côté–Gosselin royalty ground lies ~175 km northwest of Sudbury and ~500 km north of Toronto, constraining logistics.
    • Portfolio exposure includes First Quantum’s Taca Taca copper project in Argentina and Hudbay’s Copper World in Arizona.
    • Metalla also holds royalty exposure over G Mining Ventures’ Tocantinzinho gold mine in Brazil, diversifying jurisdictional risk.
    • Tether’s Q2 balance sheet shows US$187.75 billion in assets against US$183.64 billion liabilities, leaving a US$4.11 billion buffer.
    • Physical gold holdings at Tether exceeded 146 tonnes after adding 14 tonnes in Q2, plus 22 tonnes backing XAU₮ tokens.
    • Tether’s filing explicitly leaves open options to increase or reduce its Metalla position or engage on capital structure.
    • For royalty investors, the case illustrates using mine-revenue exposure to decouple from construction and operating risk.

    Our Take

    Tether’s move to a 14% stake in Metalla Royalty & Streaming aligns with its broader pivot into physical gold and gold-linked assets, as highlighted in our coverage of its roughly 140-tonne bullion accumulation in Swiss vaults; this suggests Metalla’s 100-asset royalty portfolio is being treated as an additional, yield-bearing gold proxy alongside Tether Gold’s XAU₮ tokens.

    Because Metalla’s royalties span gold, silver and copper projects such as Iamgold’s Côté mine and Codelco’s El Teniente, Tether is indirectly adding long-dated exposure to base metals and large-scale copper growth projects, which diversifies away from the purely bullion-backed structure of XAU₮ noted in recent gold reserve and ETF flow pieces in our database.

    Within our 1286 Mining stories, Tether is unusual as a crypto-stablecoin issuer building sizeable positions in listed royalty companies like Metalla and Elemental Altus Royalties, signalling that non-traditional financial players are starting to use royalty/streaming vehicles as balance-sheet tools for commodity reserve and duration management rather than just speculative equity bets.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 16 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 16 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 16 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental