Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Syntax’s digital core at Fenix gold mine: integration lessons for engineers

    April 22, 2026|

    Reviewed by Tom Sullivan

    Syntax’s digital core at Fenix gold mine: integration lessons for engineers

    First reported on International Mining – News

    30 Second Briefing

    Syntax has completed an SAP S/4HANA-based transformation for Rio2 Limited, creating a single digital core to manage construction, production, maintenance and finance at the Fenix gold mine in Chile. The cloud-hosted system integrates mine planning, procurement and asset management workflows, replacing multiple legacy tools and spreadsheets as the project moves from build-out to steady-state operations. For engineers, the platform should tighten cost control on earthworks and plant upgrades, standardise maintenance data for mobile and fixed assets, and simplify scaling as Fenix ramps up.

    Technical Brief

    • Rio2 is a junior miner, so the solution was sized for low in-house IT headcount.

    Our Take

    Syntax’s involvement at Fenix positions Rio2 Limited alongside a small but growing cluster of gold operators in our Projects/Product coverage that are building ERP and data platforms early in the project lifecycle, which typically shortens ramp‑up troubleshooting and simplifies later integration of fleet, plant and ESG data.

    For Chile, most recent Mining items in our database emphasise permitting and community interfaces; a ‘future‑ready digital core’ at a site like Fenix is likely to make regulatory reporting and traceability easier, which can be a differentiator when seeking approvals or financing for gold projects in the country.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Ivanhoe’s Platreef expansion: throughput, hoisting and cost lens for mine planners
    Mining
    about 23 hours ago

    Ivanhoe’s Platreef expansion: throughput, hoisting and cost lens for mine planners

    Ivanhoe Mines’ Platreef project in Limpopo has completed construction of the 4‑Mtpa Shaft #3, broken ground on a 3.3‑Mtpa Phase 2 concentrator and started widening Shaft #2, keeping its Phase 2 expansion on schedule for end‑2027. Hoisting capacity is set to rise five‑fold to about 5 Mtpa, lifting output from roughly 100,000 oz to over 450,000 oz of PGMs plus gold, with a projected Phase 2 life‑of‑mine cash cost of $599/oz net of byproduct credits. A future Phase 3 could take throughput to 10.7 Mtpa and extend mine life by 29 years.

    Myriad’s Wyoming uranium district build-out: scale and drilling lens for mine planners
    Mining
    about 23 hours ago

    Myriad’s Wyoming uranium district build-out: scale and drilling lens for mine planners

    Myriad Uranium’s planned all-share merger with Rush Rare Metals will consolidate control of Wyoming’s Copper Mountain district for the first time since Union Pacific’s 1970s exploration campaign, which totalled the equivalent of C$117 million in today’s dollars. A new technical report compiles historical drilling indicating 16.5–26.7 million lb. U₃O₈ across seven deposits plus Department of Energy/Bendix estimates of 245–655 million lb. in broader “control and assessment” areas, of which Myriad holds 80% and 62% respectively. A 4,500-metre stage-two drill programme in 2024–2025 aims to validate these non-compliant resources and test indications that historical grades were understated.

    Gold stocks in a ‘structural’ bull market: project economics lens for engineers
    Mining
    about 23 hours ago

    Gold stocks in a ‘structural’ bull market: project economics lens for engineers

    Gold equities remain priced near a 9.6x next‑12‑month cash flow multiple, only modestly above the five‑year 8.35x average, even as Haywood and BMO call a “structural bull market” with gold up 7.8% year‑to‑date and forecast around US$4,900–5,000/oz through 2027. Haywood flags Equinox Gold’s Valentine and Greenstone projects targeting >500,000 oz/y in Canada, Artemis Gold’s Blackwater expansion, and restart plays such as 1911 Gold’s True North and First Mining’s Springpole pending its environmental assessment. Troilus Mining’s namesake project is modelled at US$7.3 billion NPV and 47% IRR at US$5,000/oz, with a construction decision due by year‑end.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental