Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Syntax’s digital core at Fenix gold mine: integration lessons for engineers

    April 22, 2026|

    Reviewed by Tom Sullivan

    Syntax’s digital core at Fenix gold mine: integration lessons for engineers

    First reported on International Mining – News

    30 Second Briefing

    Syntax has completed an SAP S/4HANA-based transformation for Rio2 Limited, creating a single digital core to manage construction, production, maintenance and finance at the Fenix gold mine in Chile. The cloud-hosted system integrates mine planning, procurement and asset management workflows, replacing multiple legacy tools and spreadsheets as the project moves from build-out to steady-state operations. For engineers, the platform should tighten cost control on earthworks and plant upgrades, standardise maintenance data for mobile and fixed assets, and simplify scaling as Fenix ramps up.

    Technical Brief

    • Rio2 is a junior miner, so the solution was sized for low in-house IT headcount.

    Our Take

    Syntax’s involvement at Fenix positions Rio2 Limited alongside a small but growing cluster of gold operators in our Projects/Product coverage that are building ERP and data platforms early in the project lifecycle, which typically shortens ramp‑up troubleshooting and simplifies later integration of fleet, plant and ESG data.

    For Chile, most recent Mining items in our database emphasise permitting and community interfaces; a ‘future‑ready digital core’ at a site like Fenix is likely to make regulatory reporting and traceability easier, which can be a differentiator when seeking approvals or financing for gold projects in the country.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Minnova’s C$76M PL gold mine restart: economics and strip risks for engineers
    Mining
    about 8 hours ago

    Minnova’s C$76M PL gold mine restart: economics and strip risks for engineers

    Minnova plans a C$76.2 million restart of the brownfield PL gold mine near Sherridon, Manitoba, targeting 62,200 oz per year over 10 years from a high‑grade open pit feeding an existing 1,000 t/d plant, which is slated to double to 2,000 t/d in year two. The September resource stands at 3.76 million measured and indicated tonnes at 4.98 g/t Au (601,158 oz) plus 1.67 million inferred tonnes at 3.78 g/t (202,810 oz), with open pits carrying a high 21:1 waste‑to‑ore strip ratio. At US$3,000/oz gold, the PEA projects an after‑tax NPV5 of US$180.6 million, 111% IRR, eight‑month payback and all‑in sustaining costs of US$2,288/oz, but value falls sharply at lower prices, underlining cost and strip sensitivity.

    Mining
    about 8 hours ago

    Caterpillar Resource Industries leadership shift: fleet and autonomy cues for miners

    Caterpillar has confirmed that Denise Johnson, Group President of Resource Industries since 2016 and a key figure in expanding autonomous haulage and large mining truck platforms, will retire on 1 February 2027. Derrick York, currently President of Solar Turbines and a Caterpillar Senior Vice President overseeing industrial gas turbines and compressor sets, will become Group President of Resource Industries on 1 November 2026, with Johnson shifting to an advisory role. The handover timetable gives miners nearly a year of overlap to align major fleet, autonomy and support contracts with the incoming leadership.

    Anglo American copper scarcity and tech tie-ups: key takeaways for mine planners
    Mining
    about 8 hours ago

    Anglo American copper scarcity and tech tie-ups: key takeaways for mine planners

    Tech companies are in talks to buy equity in Anglo American to secure long-term copper and other data centre metals, as Comex copper trades near $6.52/lb and LME cash copper recently hit a record $14,822/t. Anglo’s planned merger with Teck Resources would create a roughly $90 billion group producing about 1.2 million tonnes of copper per year, controlling around 5% of global supply, but is still awaiting Chinese antitrust clearance tied to concentrate flows to local smelters. Wanblad also warned Anglo may close its Brazilian nickel operations at Codemin and Barro Alto if the EU blocks the $500 million sale to MMG despite proposed long-term European ferronickel supply commitments.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental