Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Syntax’s digital core at Fenix gold mine: integration lessons for engineers

    April 22, 2026|

    Reviewed by Tom Sullivan

    Syntax’s digital core at Fenix gold mine: integration lessons for engineers

    First reported on International Mining – News

    30 Second Briefing

    Syntax has completed an SAP S/4HANA-based transformation for Rio2 Limited, creating a single digital core to manage construction, production, maintenance and finance at the Fenix gold mine in Chile. The cloud-hosted system integrates mine planning, procurement and asset management workflows, replacing multiple legacy tools and spreadsheets as the project moves from build-out to steady-state operations. For engineers, the platform should tighten cost control on earthworks and plant upgrades, standardise maintenance data for mobile and fixed assets, and simplify scaling as Fenix ramps up.

    Technical Brief

    • Rio2 is a junior miner, so the solution was sized for low in-house IT headcount.

    Our Take

    Syntax’s involvement at Fenix positions Rio2 Limited alongside a small but growing cluster of gold operators in our Projects/Product coverage that are building ERP and data platforms early in the project lifecycle, which typically shortens ramp‑up troubleshooting and simplifies later integration of fleet, plant and ESG data.

    For Chile, most recent Mining items in our database emphasise permitting and community interfaces; a ‘future‑ready digital core’ at a site like Fenix is likely to make regulatory reporting and traceability easier, which can be a differentiator when seeking approvals or financing for gold projects in the country.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 14 hours ago

    Weir’s WARMAN MCR² mill circuit pump: reliability and wear-control notes for plant engineers

    Weir has introduced the WARMAN MCR² mill circuit pump as an evolution of its existing WARMAN mill circuit range, targeting mineral processing plants facing more complex ores, higher throughput and harsher slurry conditions. The MCR² is engineered to give operators tighter control over wear behaviour, maintenance intervals and overall asset condition in high-duty grinding circuits. For plant engineers, the new design signals further options to stabilise mill discharge pumping performance as ore hardness and variability increase.

    Tivan’s Walshy’s Wall drilling: subsurface targets and RC plan for mine planners
    Mining
    about 14 hours ago

    Tivan’s Walshy’s Wall drilling: subsurface targets and RC plan for mine planners

    Tivan has secured final regulatory and heritage approvals to start maiden drilling at the Walshy’s Wall target within the Sandover Fluorite Project in the Northern Territory, with a staged programme of 31 reverse circulation holes scheduled from October. Walshy’s Wall, a manganese–barite gossan discovered by Tivan geologists in October 2025, will be tested for subsurface continuity and grade using RC to penetrate the weathered profile efficiently. Early results will guide follow-up step-out drilling and resource definition across the broader fluorite–manganese system.

    Bellevue Gold board refresh: governance and project finance lens for mine teams
    Mining
    about 14 hours ago

    Bellevue Gold board refresh: governance and project finance lens for mine teams

    Bellevue Gold is adding two independent non-executive directors, Debra Counsell and Tanya Rybarczyk, to its board from 23 September 2026 as part of a planned succession process for the Western Australian gold producer. Both bring more than 30 years’ experience spanning mining, resources, finance and infrastructure, signalling a stronger governance and capital markets focus as Bellevue ramps up its namesake underground operation. The appointments point to closer board scrutiny of project financing, risk management and long-term growth options in a volatile gold price environment.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental