Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    SIEMAG TECBERG’s first Indonesia hoisting project: design and risk notes for mine engineers

    April 23, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Two sets of mine hoisting equipment from Tianjin SIEMAG TECBERG Machinery Co Ltd have passed final acceptance at the SDE 2# coal mine in Indonesia, confirming the German group’s first operational hoisting installation in the country. The project, delivered for the developing SDE 2# shaft complex, includes complete mechanical and electrical hoist systems engineered for deep coal operations. Successful commissioning signals SIEMAG TECBERG’s technical and service capability for shaft hoisting in Indonesia and supports its broader expansion strategy in Southeast Asia.

    Technical Brief

    • For other Southeast Asian deep coal shafts, the project provides a reference installation for similar hoisting system procurements.

    Our Take

    In our database, SIEMAG TECBERG mostly appears in connection with high-capacity hoisting systems in established markets, so this first coal hoist delivery into Indonesia signals a push into Southeast Asian greenfield and expansion shafts where local suppliers have traditionally dominated.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Anglo Asian Mining processing upgrades at Gedabek, Demirli: design notes for engineers

    Anglo Asian Mining is installing nine Maelgwyn Imhoflot high‑efficiency pneumatic flotation cells at its Gedabek plant in Azerbaijan, with the upgrade scheduled for completion by the end of April to expand sulphide processing capacity. Parallel investment at the Demirli operation targets additional concentrator throughput to treat ore from the nearby Gilar and Zafar deposits, integrating with existing agitation leach and heap leach circuits. The move signals a shift towards higher‑grade sulphide recovery and improved metal yields from complex polymetallic ores across the Gedabek Contract Area.

    Mining
    about 6 hours ago

    Rio2 Condestable tailings filtration facility: design and stability notes for engineers

    Commissioning has started on Rio2’s new Tailings Filtration Facility at the Condestable copper mine in Peru, an 18‑month build with a reported capital cost of about US$27 million to convert the operation to dry‑stack tailings. The facility will replace conventional slurry deposition with filtered tailings stacked on a compacted, engineered surface, reducing water return pipelines and large impoundment requirements. For geotechnical and tailings engineers, the shift implies new demands on filtration performance, stack stability design and operational monitoring in a seismically active coastal region.

    Mining
    about 6 hours ago

    WireCo synthetic pendants: fatigue and asset life insights for mine engineers

    WireCo has identified vibration and shock transfer as a major driver of structural fatigue in draglines and electric rope shovels, and is promoting its UNION Gladiator synthetic pendants to reduce these dynamic loads. By replacing traditional steel pendants with synthetic elements, the system is designed to dampen impact forces transmitted through the boom and rigging, lowering peak stresses on critical welds and chord members. The approach targets mines operating equipment at higher duty cycles, aiming to extend structural life and defer major rebuilds or replacements.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental