Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    SIEMAG TECBERG’s first Indonesia hoisting project: design and risk notes for mine engineers

    April 23, 2026|

    Reviewed by Tom Sullivan

    SIEMAG TECBERG’s first Indonesia hoisting project: design and risk notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Two sets of mine hoisting equipment from Tianjin SIEMAG TECBERG Machinery Co Ltd have passed final acceptance at the SDE 2# coal mine in Indonesia, confirming the German group’s first operational hoisting installation in the country. The project, delivered for the developing SDE 2# shaft complex, includes complete mechanical and electrical hoist systems engineered for deep coal operations. Successful commissioning signals SIEMAG TECBERG’s technical and service capability for shaft hoisting in Indonesia and supports its broader expansion strategy in Southeast Asia.

    Technical Brief

    • For other Southeast Asian deep coal shafts, the project provides a reference installation for similar hoisting system procurements.

    Our Take

    In our database, SIEMAG TECBERG mostly appears in connection with high-capacity hoisting systems in established markets, so this first coal hoist delivery into Indonesia signals a push into Southeast Asian greenfield and expansion shafts where local suppliers have traditionally dominated.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US DOE $10M critical minerals R&D: process insights for mining engineers
    Mining
    about 2 hours ago

    US DOE $10M critical minerals R&D: process insights for mining engineers

    The US Department of Energy has awarded $10 million via the Critical Materials Innovation Hub to seven early-stage R&D projects targeting more efficient recovery and refining of rare earth elements, gallium, copper and other critical materials. Funded work includes chloride-based molten salt electrolysis for heavy rare earth production at Case Western Reserve, hydro and bio-hydrometallurgical copper extraction at Colorado School of Mines, and nanobubble–surfactant–reactive oxygen leaching of copper sulphides at the University of Arizona. FAST Metals, Indium Corporation, Oak Ridge National Laboratory and the University of Illinois will trial solid-phase extraction, advanced ion-exchange resins and redox-adsorbents to recover gallium and mixed rare earth oxides from bauxite-alumina circuits, zinc refinery residues and industrial byproduct streams.

    Maglut Heavy Industries rare earth strategy: ARC-1 process insights for mine planners
    Mining
    about 2 hours ago

    Maglut Heavy Industries rare earth strategy: ARC-1 process insights for mine planners

    Maglut Heavy Industries is developing a chromatography-based rare earth processing platform at its pilot-scale Long Beach, California facility, reporting 99.9%+ purity for individual rare earth oxides using its ARC-1 water-based separation process. The company designs and manufactures its own resin and ligand systems, aiming for globally competitive costs versus conventional solvent extraction as US defence contractors face January 2027 rules to eliminate Chinese rare earth magnets. A demonstration-scale plant is planned to be fully operational by August 2027, producing commercial rare earth oxides and potentially expanding to other critical minerals.

    Gold price retreats from three‑month high: risk notes for mine planners
    Mining
    about 2 hours ago

    Gold price retreats from three‑month high: risk notes for mine planners

    Gold retreated from a three-month high after July US PCE inflation printed at 3.7% headline and 3.3% core, with Comex December futures down 1% to $4,649.10/oz and spot off 1.4% at $4,592.53 by late morning in New York. The pullback follows a 14% August surge in bullion, driven by US Treasury bond-market intervention and a 28-tonne weekly inflow into gold-backed ETFs, ahead of Kevin Warsh’s first Jackson Hole speech as Fed chair. Gold and silver miners still post outsized August gains, with Eldorado up 55%, Equinox 53% and Newmont 41%.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental