Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Scotia Metals’ Nordestina lithium option: project scale and drill strategy for engineers

    November 17, 2026|

    Reviewed by Tom Sullivan

    Scotia Metals’ Nordestina lithium option: project scale and drill strategy for engineers

    First reported on MINING.com

    30 Second Briefing

    Scotia Metals has secured an option over the 16,566-hectare Nordestina lithium project in Bahia, Brazil, where mapping has outlined suspected spodumene-bearing pegmatites along a 3.3 km by 1.4 km corridor with individual bodies several hundred metres long and 10–30 m thick. The junior can earn a 100% indirect interest for US$2 million by May 31, 2028, paying US$10,000 per month with no minimum exploration spend, and is targeting a potentially fractionated LCT system analogous to Tanco and Bikita, with spodumene, lepidolite and pollucite observed in historic pits. Initial drill targeting will be guided by 1,355 soil and rock samples now at SGS Geosol, 156 line-km of drone magnetics/radiometrics and 3.86 sq. km of LiDAR, with assays expected in late November.

    Technical Brief

    • Scotia can withdraw from the Nordestina option on 30 days’ notice and has no minimum spend.
    • Field mapping in 2026 logged 280 observation points, identifying 166 pegmatite-related sites across the permits.
    • Visual mineral counts include suspected spodumene at 100 sites, lepidolite at 13 and pollucite at three.
    • Historic artisanal pits expose spodumene–lepidolite–pollucite assemblages, with adjacent shallow pits showing lepidolite floors only.
    • A nearby pit exposing quartz–albite pegmatite without visible lithium is interpreted as a less evolved outer zone.
    • Nordestina sits in the São Francisco Craton, compared by Scotia to Tanco (Manitoba) and Bikita (Zimbabwe) LCT settings.
    • Management experience includes building or re‑engineering Brazilian hard‑rock lithium projects such as Grota do Cirilo and Bandeira.

    Our Take

    With Sigma Lithium’s Grota do Cirilo complex in Minas Gerais facing repeated regulatory and legal interruptions in 2026, as flagged in several of our recent items, Scotia Metals’ Nordestina push in Bahia positions it in a different Brazilian state where permitting and community dynamics have so far drawn less contentious coverage.

    The presence of lepidolite, pollucite and tantalum alongside spodumene at Nordestina echoes multi-commodity pegmatite systems like Manitoba’s Tanco deposit and Zimbabwe’s Bikita, implying potential by-product credits that could help Scotia Metals withstand lithium price volatility highlighted across our lithium-focused database pieces.

    Within our 101 keyword-matched lithium and spodumene stories, most Brazilian exploration attention has centred on Minas Gerais’ ‘Lithium Valley’, so Scotia’s Bahia focus on the São Francisco Craton suggests an emerging second Brazilian lithium district that could diversify country risk for offtakers currently concentrated around Grota do Cirilo and Bandeira.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Perenti–AngloGold Ashanti Geita gold mine deal: contract and JV lens for engineers
    Mining
    about 2 hours ago

    Perenti–AngloGold Ashanti Geita gold mine deal: contract and JV lens for engineers

    Perenti’s African Underground Mining Services has secured a new five-year underground mining contract at AngloGold Ashanti’s Geita gold mine in Tanzania, valued at about A$1 billion (US$67 million) through to 31 October 2031. Work will continue to be delivered via the AUMS Geofields Tanzania joint venture with local partner Geofields, extending an underground operating presence that began when Geita shifted from open pit to underground in 2016. The award signals long-term continuity for underground development, production drilling and related services at one of East Africa’s key gold operations.

    Greenland Energy–80 Mile $97m merger: project funding and drilling lens for miners
    Mining
    about 2 hours ago

    Greenland Energy–80 Mile $97m merger: project funding and drilling lens for miners

    Greenland Energy’s agreed all-share merger with 80 Mile plc values 80 Mile at about £74 million ($97.6 million), a 71% premium, with its shareholders to hold roughly 50% of the enlarged Nasdaq-listed company. The deal consolidates 100% of the Jameson Land Basin licences and combines the Disko-Nuussuaq and Dundas nickel-copper-cobalt-PGE projects in Greenland with 80 Mile’s Italian biodiesel assets. Backed by Greenland Energy’s $37.4 million cash position, April’s $70 million raise and a £3 million convertible loan, the new vehicle signals stronger funding capacity for Arctic drilling and project development.

    China’s rare earth giants’ profit surge: supply controls explained for project teams
    Mining
    about 2 hours ago

    China’s rare earth giants’ profit surge: supply controls explained for project teams

    China Northern Rare Earth and China Rare Earth Resources and Technology more than doubled net profits in the first nine months of 2026 to 3.65 billion yuan and 408 million yuan respectively, driven by tighter state supply controls and sharply higher prices. Neodymium-praseodymium (NdPr) compound prices have climbed 62% since the controls began, reaching 719,000 yuan per tonne, after Beijing cut production quota holders from six firms to two and extended quotas to imported feedstock in 2025. The strengthened quota regime and mandatory flow reporting tighten supply for magnet, battery and defence manufacturers, while reinforcing China’s leverage over US downstream projects still years from production.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental