Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Safety

    Sandvik–Rio Tinto autonomous open-pit drilling: integration and safety notes for engineers

    June 1, 2026|

    Reviewed by Tom Sullivan

    Sandvik–Rio Tinto autonomous open-pit drilling: integration and safety notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Sandvik and Rio Tinto are jointly developing integration of Sandvik i-series surface drill rigs with the Rio Tinto Autonomous Drilling System (Rio Tinto ADS™), initially targeting support drilling in open pits. The work couples Rio Tinto’s existing autonomous and remote drilling operations with Sandvik’s AutoMine® automation platform to create a common control and data interface. For mine operators, the move signals future options to standardise autonomous blasthole and support drilling fleets across mixed-vendor rigs, with potential reductions in manual exposure around highwall support and pre-split drilling.

    Technical Brief

    • Integration work is initially limited to support drilling activities rather than production blasthole drilling.
    • Sandvik’s i-series surface drill rigs are the specific hardware platform being adapted for Rio Tinto ADS™.
    • AutoMine® is the automation layer Sandvik is exposing for interoperability with Rio Tinto’s existing remote operations.

    Our Take

    Sandvik’s 2024 acquisition of Universal Field Robots, which extends AutoMine to robotic carriers, signals that the Rio Tinto collaboration could later expand beyond drilling into integrated autonomous task packages around the bench, such as stemming, survey, or light maintenance activities.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Electra–WMC Ontario cobalt refinery deal: cashflow and offtake lens for engineers
    Mining
    about 11 hours ago

    Electra–WMC Ontario cobalt refinery deal: cashflow and offtake lens for engineers

    Electra Battery Materials has signed a five-year working-capital and commercial partnership term sheet with Swiss commodities trader WMC Group AG to finance cobalt feedstock purchases and market battery-grade cobalt sulfate from its Temiskaming Shores refinery in northern Ontario. The deal covers logistics management, inventory working capital and exclusive marketing of output up to the plant’s nameplate capacity as Electra restarts North America’s only cobalt sulfate refinery, backed by US and Canadian government funding. The structure is aimed at smoothing the operating cash cycle as the project moves from construction and commissioning into production.

    SSR–Roxmore $464M deal: Nevada gold mine capex and NPV lens for planners
    Mining
    about 11 hours ago

    SSR–Roxmore $464M deal: Nevada gold mine capex and NPV lens for planners

    SSR Mining will acquire Nevada-focused Roxmore Resources for C$660.1 million in cash, securing the Converse open-pit project 6 km west of its Marigold mine, where a PEA outlines 250,000 oz. per year over 15 years, with a post-tax NPV of $2.7 billion at $3,600/oz. gold and a 42.8% IRR. Converse, hosting 103 million indicated tonnes at 0.65 g/t and 218 million inferred tonnes at 0.43 g/t, could lift SSR’s US output to 350,000–400,000 oz. annually from 2033–2042, despite an $829 million initial capex. In parallel, an updated Marigold plan extends mine life to 20 years, boosts probable reserves 43% to 4.6 million oz., and more than triples post-tax NPV to $3.3 billion, with life-of-mine capex rising to $1.3 billion and Buffalo Valley (700,000 oz. reserves) feeding first ore from 2029.

    The Ore Wars 2002–2026: iron ore price cycles mapped for mine planners
    Mining
    about 11 hours ago

    The Ore Wars 2002–2026: iron ore price cycles mapped for mine planners

    Iron ore’s journey from a $13/t, annually negotiated benchmark in 2002 to a daily traded futures market peaking at $237.57/t in May 2021 is mapped in MINING.COM’s “Ore Wars” interactive, tracking 49 key inflection points. The timeline covers BHP’s failed $140 billion bid for Rio Tinto, the collapse to $37/t in December 2015, the Samarco and Brumadinho tailings disasters, and China’s push for yuan‑denominated pricing. For mine planners and marketers, it neatly links price shocks to supply surges, port stockpiles, freight rates and single‑buyer risk.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental