Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Sandvik Rotary Geo: drilling‑data hardness mapping for blast design teams

    November 13, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    Sandvik’s Rotary Geo software now uses real-time data from i-series rotary blasthole drills fitted with TIM3D navigation and the iLink Data Interface to detect changes in rock hardness during drilling. An onboard analysis algorithm interprets parameters such as penetration rate and rotary torque to map hardness variations along each hole, giving geologists and drill‑and‑blast engineers finer control over burden, spacing and explosive energy distribution. The tool is aimed at tightening fragmentation control and reducing overdrilling and misfires in large open-pit operations.

    Technical Brief

    • Rotary Geo is restricted to Sandvik i-series rotary blasthole rigs already fitted with TIM3D.
    • Data transfer relies on Sandvik’s proprietary iLink Data Interface rather than third‑party telemetry systems.
    • Processing occurs onboard the drill, avoiding dependence on pit‑wide wireless coverage or cloud latency.
    • Output hardness profiles are generated per hole, enabling correlation with blast blocks and dig polygons.
    • Integration targets large open pits where rotary blasthole fleets dominate primary production drilling.
    • Sandvik positions Rotary Geo as an add‑on within its existing digital drill automation ecosystem.
    • For mines already standardised on i-series rigs, deployment is mainly a software and configuration exercise.
    • Similar drill‑derived rock characterisation is likely to be extended to down‑the‑hole and top‑hammer fleets.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Rare Earths Americas’ Homer project: footprint growth and HREO upside for mine planners
    Mining
    about 2 hours ago

    Rare Earths Americas’ Homer project: footprint growth and HREO upside for mine planners

    Rare Earths Americas has expanded the mineralised footprint at its Homer-A ionic clay rare earth project in Goiás, Brazil by over 60% to about 3.5 km², with the main zone now extending 4.3 km and remaining open. Assays from 20 holes within the primary geochemical anomaly show 19 above cut-off, while drilling on the south-eastern margin has returned heavy rare earth oxides with dysprosium-terbium oxides reaching up to 8.7% of total rare earth oxides plus scandium. Only 22 of roughly 180 planned holes have been assayed, with 11,800 m of a 15,000 m 2026 programme already drilled and a maiden resource targeted for 2027.

    Nemaska pause and Rio Tinto’s Quebec lithium plans: project economics lens for engineers
    Mining
    about 2 hours ago

    Nemaska pause and Rio Tinto’s Quebec lithium plans: project economics lens for engineers

    Construction of Rio Tinto’s Nemaska lithium hydroxide plant at Bécancour, Quebec, more than 70% complete and backed by about C$1.2 billion in public funding, is now expected to remain paused through 2027, casting doubt on the previously committed 2028 start-up. The halt coincides with 68 layoffs and a sharp drop in Asian lithium carbonate spot prices to $12.90/kg from over $25/kg in May, pressuring project economics. Rio is still reviewing long-term spodumene feed from Nemaska’s Whabouchi deposit versus its wholly owned Galaxy project, with no decision yet.

    Hudbay cost outlook cut as Copper Mountain improves: capex and throughput notes for engineers
    Mining
    about 2 hours ago

    Hudbay cost outlook cut as Copper Mountain improves: capex and throughput notes for engineers

    Hudbay Minerals has cut its 2026 copper cash cost outlook to negative US$0.55 to negative US$0.35 per lb (after by-product credits) as Copper Mountain in British Columbia delivered positive free cash flow for the first time since its June 2023 acquisition, with the mill hitting 43,500 t/d in September and targeting 50,000 t/d by year-end. Third-quarter copper output rose 25% year-on-year to 30,152 tonnes and gold 30% to 69,513 oz, helping revenue more than double to a record US$765.9 million and allowing sustaining capital to come in about US$35 million below the US$435-million budget. The stronger operating base underpins Hudbay’s approval, alongside Mitsubishi, of the US$2.1-billion Copper World project in Arizona, where Hudbay expects to contribute about US$500 million from 2028 towards first production in H2 2029.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental