Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Nemaska pause and Rio Tinto’s Quebec lithium plans: project economics lens for engineers

    November 13, 2026|

    Reviewed by Joe Ashwell

    Nemaska pause and Rio Tinto’s Quebec lithium plans: project economics lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Construction of Rio Tinto’s Nemaska lithium hydroxide plant at Bécancour, Quebec, more than 70% complete and backed by about C$1.2 billion in public funding, is now expected to remain paused through 2027, casting doubt on the previously committed 2028 start-up. The halt coincides with 68 layoffs and a sharp drop in Asian lithium carbonate spot prices to $12.90/kg from over $25/kg in May, pressuring project economics. Rio is still reviewing long-term spodumene feed from Nemaska’s Whabouchi deposit versus its wholly owned Galaxy project, with no decision yet.

    Technical Brief

    • Long‑term feed review compares Nemaska’s Whabouchi deposit with Rio’s wholly owned Galaxy project, with no selection yet.
    • For other lithium conversion projects, similar price shocks can rapidly strand partially built downstream assets and public capital.

    Our Take

    Rio Tinto’s pause at the Bécancour lithium plant contrasts with its concurrent capital allocation into US copper, such as the $144 million Resolution Copper phase in Arizona, signalling that near-term spend is being prioritised towards brownfield or late-stage copper over early-stage lithium chemicals in Quebec.

    With lithium carbonate spot prices in Asia having more than halved from above $25/kg to $12.9/kg, the economics of a Quebec-based lithium hydroxide chain look materially tighter, which likely raises the hurdle rate for further Rio and Investissement Québec equity beyond the roughly $500 million already earmarked for the province’s lithium business.

    Our database shows lithium and lithium carbonate appear across 100 keyword-matched pieces, but relatively few involve Canada or Quebec, so Nemaska’s extended construction pause removes one of the more advanced North American conversion projects from the near-term supply pipeline just as US projects like Hudbay’s Copper World in Arizona continue to move through permitting and study phases.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Rare Earths Americas’ Homer project: footprint growth and HREO upside for mine planners
    Mining
    about 2 hours ago

    Rare Earths Americas’ Homer project: footprint growth and HREO upside for mine planners

    Rare Earths Americas has expanded the mineralised footprint at its Homer-A ionic clay rare earth project in Goiás, Brazil by over 60% to about 3.5 km², with the main zone now extending 4.3 km and remaining open. Assays from 20 holes within the primary geochemical anomaly show 19 above cut-off, while drilling on the south-eastern margin has returned heavy rare earth oxides with dysprosium-terbium oxides reaching up to 8.7% of total rare earth oxides plus scandium. Only 22 of roughly 180 planned holes have been assayed, with 11,800 m of a 15,000 m 2026 programme already drilled and a maiden resource targeted for 2027.

    Hudbay cost outlook cut as Copper Mountain improves: capex and throughput notes for engineers
    Mining
    about 2 hours ago

    Hudbay cost outlook cut as Copper Mountain improves: capex and throughput notes for engineers

    Hudbay Minerals has cut its 2026 copper cash cost outlook to negative US$0.55 to negative US$0.35 per lb (after by-product credits) as Copper Mountain in British Columbia delivered positive free cash flow for the first time since its June 2023 acquisition, with the mill hitting 43,500 t/d in September and targeting 50,000 t/d by year-end. Third-quarter copper output rose 25% year-on-year to 30,152 tonnes and gold 30% to 69,513 oz, helping revenue more than double to a record US$765.9 million and allowing sustaining capital to come in about US$35 million below the US$435-million budget. The stronger operating base underpins Hudbay’s approval, alongside Mitsubishi, of the US$2.1-billion Copper World project in Arizona, where Hudbay expects to contribute about US$500 million from 2028 towards first production in H2 2029.

    Armenia’s mining revival: ESG, data gaps and project risks for engineers
    Mining
    about 2 hours ago

    Armenia’s mining revival: ESG, data gaps and project risks for engineers

    Armenia is courting international miners after the third Armenia Mining Forum in Yerevan drew nearly 400 executives and officials, with Prime Minister Nikol Pashinyan signalling a push for a “qualitatively new mining industry” built on copper, gold and molybdenum. Wood Mackenzie’s investment perception survey cited an experienced workforce and strong geology but flagged limited geological data and regulatory uncertainty, even as the long-delayed Amulsar gold mine finally entered production. Former Anglo American CEO Mark Cutifani urged Armenia to evolve from conventional extraction towards a broader “materials solutions industry” while aligning with biodiversity, nature-related disclosure and international ESG standards to secure public trust.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental