Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    S2’s first Jillewarra drilling: exploration pipeline signals for WA mine planners

    June 26, 2026|

    Reviewed by Joe Ashwell

    S2’s first Jillewarra drilling: exploration pipeline signals for WA mine planners

    First reported on Australian Mining

    30 Second Briefing

    Exploration activity is ramping up across Western Australia as S2 Resources prepares its first drilling program at the Jillewarra gold project in the Murchison, while Lefroy Exploration advances metallurgical testwork and resource growth at its Goldfields assets. Rincon Resources is simultaneously expanding copper–gold drilling in the Pilbara, targeting extensions to existing mineralised zones rather than pure greenfields step-out. For geotechs and mine planners, the cluster of early-stage drilling, metallurgy and resource definition signals a strengthening pipeline of potential open-pit and underground projects in key WA belts.

    Technical Brief

    • S2 Resources is preparing a maiden drill program at the Jillewarra gold project in WA’s Murchison.
    • Lefroy Exploration is advancing metallurgical testwork on its Goldfields gold assets to refine processing assumptions.
    • Rincon Resources is expanding copper–gold drilling in the Pilbara, targeting extensions to known mineralisation.
    • Program updates span three key WA belts: Murchison, Eastern Goldfields and Pilbara, aiding regional targeting.

    Our Take

    Lefroy Exploration’s work at Lucky Strike in the Western Australian Goldfields, noted in our recent coverage, suggests that S2 Resources is advancing Jillewarra into a region where juniors are actively de‑risking gold targets rather than just holding ground.

    With Ramelius Resources progressing the Roe gold project under a standard EPA Part V pathway, regulatory signals in Western Australia remain relatively predictable for gold projects, which likely benefits early‑stage explorers like S2 Resources, Lefroy Exploration and Rincon Resources when planning follow‑up drilling and potential scale‑up.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    PLS Pilgangoora 22-sorter TOMRA contract: process design notes for engineers
    Mining
    about 6 hours ago

    PLS Pilgangoora 22-sorter TOMRA contract: process design notes for engineers

    TOMRA Mining has secured a contract from Pilgangoora Operations Pty Ltd, a PLS Group subsidiary, to supply 22 sensor-based ore sorters for the P2000 Expansion Project at the Pilgangoora lithium operation in Western Australia. The installation is part of PLS’ pre-Final Investment Decision early works, signalling commitment to large-scale sorting ahead of full project sanction. For process engineers, the move points to increased reliance on front-end sensor-based separation to upgrade run-of-mine feed and manage lithia grade variability before downstream concentration.

    Macmahon’s 42‑month Telfer Gold Mine extension: planning notes for project teams
    Mining
    about 6 hours ago

    Macmahon’s 42‑month Telfer Gold Mine extension: planning notes for project teams

    Macmahon Contractors has secured a 42‑month extension to provide contract mining services at Greatland Resources’ Telfer Gold Mine in Western Australia, valued at A$485 million over the term. The deal locks in a multi‑year mining services pipeline at one of the state’s major gold operations, supporting continuity of fleet deployment, workforce planning and site-based maintenance. Contractors and suppliers can expect sustained demand for open-pit and underground support services, consumables and rebuilds tied to Telfer’s existing mine plan.

    Metso–Valmet Flowrox pump deal: slurry circuit implications for mine engineers
    Mining
    about 6 hours ago

    Metso–Valmet Flowrox pump deal: slurry circuit implications for mine engineers

    Metso has agreed to acquire Valmet’s Flowrox™ peristaltic hose pump and progressive cavity pump technologies, including associated spare parts and service capabilities, targeting abrasive and chemically aggressive slurry duties in mining and minerals processing. The deal adds positive displacement options alongside Metso’s existing slurry and submersible pump lines, enabling tighter process control in applications such as thickener underflow, filter feed and reagent dosing. For operators, the integration should simplify lifecycle support and parts standardisation across critical slurry handling circuits.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental