Roy Hill’s autonomous trucks haul 500 Mt: productivity lessons for mine planners
Reviewed by Tom Sullivan

First reported on The Construction Index
30 Second Briefing
Autonomous haul trucks at Hancock Iron Ore’s Roy Hill mine in Western Australia have hauled more than 500 million tonnes of material after Epiroc converted 78 conventional units to driverless operation using its LinkOA automation platform. The mixed fleet has travelled over 12.1 million kilometres autonomously, with LinkOA coordinating different truck makes and models within a single network. Haulage productivity has accelerated sharply, with the first 100 million tonnes taking more than three years and the most recent 100 million moved in just five months, signalling rapid scalability of large-pit autonomy.
Technical Brief
- LinkOA retrofits manual haul trucks to driverless operation, avoiding full fleet replacement capital.
- Roy Hill’s converted fleet is described as the world’s largest autonomous mixed-make haulage fleet.
- Mixed-fleet autonomy allows different OEM truck models to share a single control and dispatch network.
- Epiroc reports 12.1 million km of autonomous travel, equivalent to ~303 equatorial circumnavigations.
- The 500 Mt moved is likened to about 85 times the mass of the Great Pyramid of Giza.
- Progressive scaling occurred in parallel with ongoing production, indicating autonomy deployment without major shutdowns.
- Epiroc’s Surface division frames the project as evidence that mixed-fleet automation can operate at large scale.
Our Take
Epiroc features in multiple recent items in our database, from this Roy Hill iron ore automation milestone in Western Australia to SmartROC D65 deployments at the Vicuña copper JV in Argentina, signalling a push to prove automation performance across both bulk open-pit iron ore and high-altitude copper projects.
Moving more than 500 million tonnes autonomously at the Roy Hill iron ore mine gives Hancock Iron Ore a rare, production-scale data set on tyre wear, fuel burn and cycle times for a 78‑truck fleet, which operators at other Pilbara iron ore sites are likely to scrutinise when justifying retrofit versus greenfield autonomous haulage investments.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


