Waratah’s shallow Goldenclad hit: open-pit potential and drilling notes for mine planners
Reviewed by Joe Ashwell

First reported on Australian Mining
30 Second Briefing
Waratah Minerals has reported a standout diamond drill intercept of 10m at 12.18g/t Au from 49m depth within a broader 17m interval at 7.35g/t at the Goldenclad prospect in New South Wales. The mineralisation in hole GCD002 occurs at relatively shallow depths, materially improving open-pit potential and drill economics compared with typical deeper lode targets in the region. Results support Waratah’s strategy to grow the existing Spur gold project resource footprint, with follow-up drilling likely to focus on lateral continuity and down-dip extensions of the high-grade zone.
Technical Brief
- Shallow high-grade lodes reduce drill metre costs versus deeper or underground-focused targets in New South Wales.
Our Take
The shallow, high‑grade gold intercepts at the Goldenclad prospect sit on top of an already defined 3.1Moz resource at the Spur project in New South Wales, as reported on 5 November 2026, which suggests upside for both grade and near‑surface ounces beyond the current JORC envelope.
With Waratah Minerals having secured $50 million in equity commitments to fund over 100,000m of drilling at Spur (19 November 2026), results like 10m @ 12.18g/t from 49m depth indicate that a meaningful portion of that budget can now be targeted at rapidly converting shallow discoveries into resource additions.
Our database shows multiple recent Spur‑related pieces describing mineralisation continuity along a 6km corridor between the main Spur deposit and the historic Essex Mine (2 November 2026), so Goldenclad’s high‑grade hits strengthen the case for a district‑scale gold system rather than a single isolated orebody.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Tunnelling
Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


