    Rosh Pinah Zinc paste backfill plant: design and dilution control notes for engineers

    February 7, 2026|

    Reviewed by Joe Ashwell

    Rosh Pinah Zinc paste backfill plant: design and dilution control notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Rosh Pinah Zinc has commissioned Namibia’s first paste backfill plant at the Rosh Pinah zinc-lead-silver mine, enabling cemented paste backfilling of underground stopes to cut dilution, reduce surface tailings and improve ore recovery while being run by a locally trained operations team. The RP2.0 expansion, now over 85% complete and targeting Q3 2026 completion, includes a new portal and decline, new paste fill and processing facilities, a SAG mill and water treatment plants. In parallel, RPZ is executing more than 80 km of diamond drilling to 2027, covering infill, step-out and regional targets to extend mine life.

    Technical Brief

    • Paste backfill plant is Namibia’s first, setting a new national reference design for underground backfilling.
    • Commissioning was announced 6 February 2026 by Rosh Pinah Zinc and owner Appian Capital Advisory.
    • RP2.0 construction progress has surpassed 85%, with mechanical completion targeted for Q3 2026.
    • Ramp‑up of the expanded operation is scheduled immediately after Q3 2026 completion, implying tight commissioning windows.
    • New portal and decline are being developed specifically to access extended deposits on strike and down‑dip.
    • Surface works include a new SAG mill and water treatment plants integrated with the paste fill facility.
    • Diamond drilling programme totals >80 km through 2027, combining infill, step‑out and regional targets.

    Our Take

    Within our 924 Mining stories, Namibia appears far less frequently than other African jurisdictions, so Rosh Pinah Zinc’s RP2.0 expansion stands out as one of the few large-scale zinc-lead-silver underground modernisation plays in the region.

    Paste backfill at the Rosh Pinah zinc-lead silver mine should allow tighter stope sequencing and higher extraction ratios, which is particularly relevant given the plan for more than 80 km of drilling through 2027 to convert and extend underground resources.

    With overall RP2.0 construction already beyond 85% and completion targeted for Q3 2026, Appian Capital Advisory’s involvement positions this as a near- to medium-term zinc supply response in our database, at a time when many other zinc projects are still at earlier study or permitting stages.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 4 hours ago

    JOEST Australia’s Pilgangoora expansion order: design and wear notes for mine engineers

    JOEST Australia has secured the largest order in its history from Pilgangoora Operations Pty Ltd for the PLS P2000 Expansion Project at the Pilgangoora hard rock lithium mine in Western Australia. The contract covers multiple vibrating screens, feeders and a primary grizzly, building on JOEST’s previous scope at the site. With the P1000 Expansion Project due to complete in 2025, the new package signals further scaling of front-end crushing and screening capacity, with implications for equipment sizing, wear-liner selection and maintenance planning in high-throughput lithium circuits.

    Mining
    about 4 hours ago

    BHP’s first Olympic Dam block cave resource: design and cave stability notes for engineers

    BHP has declared a first underground block cave resource at Olympic Dam in South Australia, reporting 10,730 Mt at 0.59% Cu, 0.19 kg/t U3O8, 0.21 g/t Au and 1 g/t Ag in its operational review to 30 September 2026. The scale and grade support long-life mass mining beyond the existing sublevel open stoping, with block caving likely to demand extensive footprint development, cave propagation monitoring and high-capacity materials handling. Geotechnical teams will be focused on managing cave stability in the complex copper-uranium breccia-hosted system and controlling subsidence above critical surface infrastructure.

    Mining
    about 4 hours ago

    FLANDERS hybrid cabinet on Komatsu 930E at Belle Ayr: lifecycle gains for mine fleets

    FLANDERS has completed a claimed world-first installation of its hybrid-electric control cabinet on a diesel-electric Komatsu 930E haul truck operated by Eagle Summit Resources at the Belle Ayr coal mine in Wyoming. The retrofit cabinet replaces legacy electric-drive controls to address haul truck obsolescence while retaining the existing diesel-electric drivetrain. For mine operators, the approach signals a pathway to extend 930E fleet life and prepare for future higher-level electrification without full truck replacement.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental