Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Research

    Prospectiva’s rich copper hit at São Francisco: VMS geometry notes for mine planners

    November 24, 2026|

    Reviewed by Tom Sullivan

    Prospectiva’s rich copper hit at São Francisco: VMS geometry notes for mine planners

    First reported on MINING.com

    30 Second Briefing

    Prospectiva Resources has reported its best intercept to date at the São Francisco copper project in Brazil’s Borborema belt, with step-out hole SF_26_006 cutting 10.02 m at 11.75% Cu, 0.87 g/t Au and 1.09% Zn from 104.98 m, about 60 m northeast of SF_26_003 (7.15 m at 4.78% Cu from 85.85 m). The results support an eastward-deepening volcanogenic massive sulphide interpretation along a 3 km prospective corridor, with two diamond rigs drilling towards an initial resource in 2027. Current work integrates drill-core measurements and EM-derived targets with ~5,900 m of historical Yamana drilling to refine the folded sulphide body geometry.

    Technical Brief

    • Reported intercepts are downhole lengths only; true thicknesses of sulphide lenses are currently unconstrained.
    • Current targets combine extensions of known mineralised zones with anomalies defined by electromagnetic geophysical surveys.
    • Deposit interpretation relies on integrating drill-core measurements with geophysical data to model a folded VMS-style sulphide body.
    • Scope limitations include incomplete assay coverage, unknown true widths, and reliance on early-stage structural interpretation of the VMS system.

    Our Take

    The Borborema mineral belt in northeastern Brazil appears only sporadically in our 1290 Mining stories, which suggests Prospectiva is advancing in a comparatively under-reported district versus more mature copper belts like Carajás, potentially giving it first-mover leverage on any emerging camp-scale story.

    With a market cap of about C$15 million and two rigs active on a 3 km corridor, Prospectiva is running a relatively aggressive drill programme for its size, which often signals an intent to fast-track a maiden resource within the next year to crystallise value or set up a strategic transaction.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Waratah’s shallow Goldenclad hit: open-pit potential and drilling notes for mine planners
    Mining
    about 2 hours ago

    Waratah’s shallow Goldenclad hit: open-pit potential and drilling notes for mine planners

    Waratah Minerals has reported a standout diamond drill intercept of 10m at 12.18g/t Au from 49m depth within a broader 17m interval at 7.35g/t at the Goldenclad prospect in New South Wales. The mineralisation in hole GCD002 occurs at relatively shallow depths, materially improving open-pit potential and drill economics compared with typical deeper lode targets in the region. Results support Waratah’s strategy to grow the existing Spur gold project resource footprint, with follow-up drilling likely to focus on lateral continuity and down-dip extensions of the high-grade zone.

    PC Gold’s $1.59bn Spring Hill plan: mine design and risk notes for engineers
    Mining
    about 2 hours ago

    PC Gold’s $1.59bn Spring Hill plan: mine design and risk notes for engineers

    PC Gold’s pre-feasibility study for the Spring Hill project in the Northern Territory sets out a $1.59 billion pre-tax valuation and a maiden 951,000-ounce gold ore reserve, supporting a standalone open-pit and underground operation. The plan targets production of about 1.03 million ounces of gold over an initial 9.5-year mine life, implying moderate-scale processing and sustained ore delivery from both surface and underground stopes. Geotechnical design will need to accommodate long-term pit wall stability and underground access sequencing over nearly a decade of concurrent operations.

    Gateway Panakin fresh-rock gold hit: targeting depth potential for mine planners
    Mining
    about 2 hours ago

    Gateway Panakin fresh-rock gold hit: targeting depth potential for mine planners

    Gateway Mining has intersected fresh-rock gold grading 1m at 16.5g/t from recent aircore drilling at the Panakin prospect within its Yandal gold project in Western Australia. The mineralisation occurs beneath transported cover, indicating untested fresh-rock potential beyond the existing regolith anomalies that have guided earlier programmes. For explorers and resource modellers, the result suggests scope for higher-grade lodes at depth and justifies follow-up RC or diamond drilling to define geometry, continuity and potential open-pit or underground development scenarios.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental