Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    PLS–Canmax spodumene offtake: utilisation and pit planning notes for engineers

    February 9, 2026|

    Reviewed by Joe Ashwell

    PLS–Canmax spodumene offtake: utilisation and pit planning notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Pilbara Minerals has executed a new binding spodumene concentrate offtake agreement with Chinese lithium chemicals producer Canmax Technologies, securing long-term sales from its Pilgangoora operation in Western Australia. The deal extends an existing supply relationship centred on Pilgangoora’s large-scale hard-rock lithium mine, which is supported by a six‑megawatt solar farm integrated into the site’s power system. For geotechnical and mining teams, the agreement signals continued high utilisation of Pilgangoora’s open-pit reserves and processing capacity, supporting ongoing pit expansion and infrastructure planning.

    Technical Brief

    • Integration of the six‑megawatt solar farm requires coordinated load management with crushers, mills and thickeners.

    Our Take

    The new Canmax offtake sits alongside Pilbara Minerals’ P1000 expansion push at Pilgangoora (flagged in our 17 December 2025 coverage), suggesting PLS is progressively pre‑securing demand for the step‑up towards 1 Mtpa spodumene concentrate capacity.

    In our database of 98 lithium- and spodumene‑tagged pieces, relatively few Australian producers have Chinese offtakers as prominent as Canmax, which likely gives PLS additional pricing and financing leverage compared with single‑market or merchant sellers.

    Recent articles on Pilgangoora highlight parallel investment in site services and solar power, indicating that locking in Chinese offtake for spodumene is being paired with operational and energy upgrades to keep the Western Australian operation competitive through the lithium price cycle.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 12 hours ago

    Boliden Somincor–EDP–Greenvolt solar UPAC: integration notes for Neves‑Corvo mine engineers

    Boliden Somincor has partnered with EDP and Greenvolt to build Portugal’s largest self‑consumption solar generation unit (UPAC) near the Neves‑Corvo zinc mine at Castro Verde, supplying power directly to mine operations. The distributed solar plant will sit adjacent to one of Europe’s largest zinc orebodies, reducing grid dependence for high‑load processes such as hoisting, ventilation and paste backfill plants. For mine planners and electrical engineers, the project signals growing integration of large‑scale on‑site renewables into base‑metal underground operations in southern Europe.

    Mining
    about 16 hours ago

    Aramine AutoNav Tele loader at Reward Gold mine: design and safety notes for planners

    RCT – Powered by Epiroc’s AutoNav Tele automation has been fitted to an Aramine L350D loader to support narrow vein stoping at Vertex Minerals’ Reward Gold mine at Hill End, after the unit was commissioned through Epiroc’s Orange Service Centre in New South Wales. The compact L350D, designed for ultra-narrow headings, is now operated via tele-remote AutoNav control rather than line-of-sight, allowing tramming and loading in constrained drives. For geotechnical and mine planners, this enables extraction in thinner ore lenses while keeping operators out of unsupported ground.

    Mining
    about 17 hours ago

    Bosch Rexroth–MEDATech off‑highway electrification: integration notes for mine engineers

    Bosch Rexroth is partnering with MEDATech Engineering to deliver end‑to‑end electrification packages for off‑highway and mining mobile equipment, combining Rexroth’s mobile hydraulics, inverters and controls with MEDATech’s EV drivetrain integration capability. The collaboration targets full systems from componentry and software through to application‑specific design and build, aimed at OEMs and retrofit projects for haul trucks, loaders and other heavy units. For mine operators, this points to more standardised electric powertrain architectures and a clearer route to integrating high‑voltage drivetrains with existing hydraulic and control systems.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.