Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Pilbara Minerals’ Pilgangoora: record FY26 output and what it means for mine planners

    July 31, 2026|

    Reviewed by Tom Sullivan

    Pilbara Minerals’ Pilgangoora: record FY26 output and what it means for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Pilbara Minerals’ Pilgangoora operation in Western Australia delivered a record 879,500 tonnes of spodumene concentrate in FY26, a 17 per cent increase on FY25 and above production guidance. Annual sales volumes also rose 17 per cent, signalling strong offtake demand for Pilgangoora’s concentrate blend and sustained utilisation of its processing circuits. For mine planners and process engineers, the uplift confirms stable pit sequencing, plant availability and logistics capacity at a time of volatile lithium pricing.

    Technical Brief

    • Spodumene concentrate production is derived from pegmatite-hosted ore, implying drill-and-blast with conventional truck–shovel mining.
    • Processing flowsheet is based on physical beneficiation of spodumene-bearing ore, rather than brine evaporation.
    • Hard-rock lithium mining at Pilgangoora typically requires continuous pit dewatering and geotechnical control of steep pegmatite walls.

    Our Take

    The 17 per cent lift in lithium and spodumene concentrate output at Pilgangoora lines up with recent coverage of the P1000 and proposed P2000 expansions, signalling that PLS is scaling hard-rock capacity ahead of those debottlenecking and growth projects rather than waiting for final investment decisions.

    Our database shows relatively few Australian lithium pieces involving mine-site mid-stream processing, so PLS’s new Pilgangoora facility positions it among the first movers trying to capture more value per tonne of concentrate and partially buffer revenue against raw spodumene price volatility into FY26.

    With Pilgangoora in Western Australia featuring across several of the 114 lithium-tagged items in our coverage, the operation is emerging as a reference case for integrating sensor-based ore sorting (via TOMRA) and on-site upgrading, which other spodumene producers are likely to watch closely for operating cost and recovery benchmarks.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    1 day ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    1 day ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    1 day ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental