Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Perpetua’s $55.5m tungsten deal at Stibnite: project and offtake lens for mine planners

    November 18, 2026|

    Reviewed by Tom Sullivan

    Perpetua’s $55.5m tungsten deal at Stibnite: project and offtake lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Perpetua Resources is negotiating a non-equity funding deal of up to $55.5 million with an unnamed aerospace and defence company, which would secure rights to purchase as much as 50% of future tungsten output from the Stibnite Mining District in Idaho under its Industrial Tungsten Acceleration Program. The potential deal would sit alongside a 36‑month, $40 million U.S. Army DOTC award to test the technical and economic feasibility of tungsten concentrate production at Stibnite, already permitted as a gold‑antimony mine with planned output of about 450,000 oz/y of gold. Initial work, if funded, would focus on exploration drilling, resource definition, metallurgical and processing testing, and decline design and permitting, followed by underground exploration, pilot‑scale processing and recovery circuit assessment.

    Technical Brief

    • Proven and probable reserves support more than six million ounces of gold and 148 million lb antimony.
    • Planned gold production is about 450,000 oz per year under the existing mine plan.
    • The DOTC award runs over 36 months and specifically funds tungsten concentrate feasibility workstreams.
    • Phase 1 tungsten work covers exploration drilling, resource definition, metallurgy, processing testwork, and decline design/permitting.
    • A second phase would extend to underground exploration and development plus pilot-scale processing and recovery circuit optimisation.
    • Additional environmental reviews and permits will be required before any tungsten mining or underground development proceeds.
    • The MoU is non-binding, imposes no funding or offtake obligations, and any final deal needs separate approvals.

    Our Take

    Within our 1262 Mining stories, tungsten appears far less frequently than gold, and most tungsten‑tagged coverage is tied to ‘critical minerals’ and defence themes, suggesting Perpetua’s Idaho‑based tungsten output could be benchmarked more against strategic supply projects than conventional base‑metal mines when it comes to financing and permitting expectations.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    PNG’s next mineral wave panel: access, slopes and capex signals for mine planners
    Mining
    about 5 hours ago

    PNG’s next mineral wave panel: access, slopes and capex signals for mine planners

    The PNG Mining and Industrial Exhibition and Conference has confirmed a panel titled “Unlocking PNG’s Next Mineral Wave” to examine how exploration leaders are identifying and funding new mineral opportunities across Papua New Guinea’s complex terrain. Panellists will focus on early‑stage project financing, exploration targeting in remote high‑rainfall provinces, and the permitting environment for copper–gold and critical mineral prospects. For geotechnical and mine planners, the discussion signals growing attention on frontier deposits where access, infrastructure corridors and slope stability will be major cost and schedule drivers.

    Meeka Murchison gold grade boost: ore sorting implications for mine planners
    Mining
    about 5 hours ago

    Meeka Murchison gold grade boost: ore sorting implications for mine planners

    Meeka Metals has recorded a five-fold upgrade in gold grade at its Murchison project in Western Australia, with a Steinert multi-sensor ore sorter lifting low-grade underground development ore from 0.86g/t to a 4.39g/t gold product during initial commissioning. The sorter is treating underground development material rather than stoping ore, indicating potential to convert previously marginal headings into viable feed. For mine planners and process engineers, this points to scope for tighter cut-off grades, reduced haulage of waste, and more selective underground development in similar narrow-vein or low-grade settings.

    From tailings to opportunity: microbial reprocessing and closure risks for engineers
    Mining
    about 5 hours ago

    From tailings to opportunity: microbial reprocessing and closure risks for engineers

    Australian researchers are investigating mine tailings as a secondary resource, using microbes identified by Monash University in historic South Australian waste to mobilise residual metals and alter mineralogy. The work examines how microbial consortia can leach critical and base metals from decades-old tailings while potentially improving geochemical stability relevant to long-term rehabilitation. For geotechnical and closure planning, this raises questions about tailings storage design, long-term water and oxygen ingress, and whether “reactivated” tailings chemistries need new monitoring and risk criteria.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental