Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Osisko–JDS Cariboo gold build: execution and EPCM takeaways for mine engineers

    February 10, 2026|

    Reviewed by Tom Sullivan

    Osisko–JDS Cariboo gold build: execution and EPCM takeaways for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Osisko Development’s Barkerville Gold Mines has signed a definitive project and construction management services agreement with JDS Energy & Mining to build the Cariboo underground gold project in British Columbia. A feasibility study completed in April 2025 outlines a “robust and scalable” underground mine, with JDS to coordinate detailed engineering, procurement and construction management across the processing plant, underground infrastructure and surface facilities. The deal signals progression from study to execution, with geotechnical design, underground access development and shaft/decline construction planning now moving onto a defined EPCM footing.

    Technical Brief

    • Agreement scope covers processing plant, underground mine infrastructure and all associated surface support facilities.
    • JDS role includes coordinating detailed engineering, procurement, construction management and site integration of multiple work packages.
    • Barkerville Gold Mines remains project owner, with JDS acting as project and construction manager rather than EPC.
    • Contract moves Cariboo from feasibility-level design into execution planning, including constructability and sequencing reviews.
    • Underground works under JDS remit expected to include primary access development, materials handling and services distribution.
    • Surface facilities package likely to bundle tailings, waste management, power distribution and camp/laydown infrastructure under one manager.
    • Having a single construction manager across plant and underground reduces interface risk between mine, process and infrastructure teams.

    Our Take

    Among the 313 gold-related pieces in our database, British Columbia projects like Cariboo feature less frequently than Québec or Ontario assets, signalling that this build could become one of the province’s more closely watched gold developments over the next few years.

    With the Cariboo gold project only reaching feasibility study stage in April 2025, bringing in JDS Energy & Mining at this point suggests Osisko Development is trying to compress the typical study-to-execution lag seen in many Canadian gold projects in our coverage.

    Osisko Development and Barkerville Gold Mines appear far less often in our recent gold project coverage than larger Canadian producers, so a contracted build at Cariboo may be important for them to establish a construction and operating track record comparable to mid-tier peers.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    TerraLithium and BHE Renewables: geothermal lithium project lens for mine planners
    Mining
    about 7 hours ago

    TerraLithium and BHE Renewables: geothermal lithium project lens for mine planners

    TerraLithium, an Occidental subsidiary, and BHE Renewables have produced lithium chloride from geothermal brines at BHE’s Calipatria geothermal plant in California’s Imperial Valley and converted it to battery-grade lithium carbonate. The partners have also directly converted lithium chloride to lithium hydroxide using a commercial-scale electrolyser at TerraLithium’s Brawley R&D facility in the US’s second-largest geothermal field, validating high-purity output against commercial processing standards. BHE Renewables plans to build, own and operate full-scale lithium production facilities in Imperial County once technical and economic feasibility is proven.

    Ground view Kazakhstan at Qarmet mines: safety, control and data lessons for engineers
    Mining
    about 7 hours ago

    Ground view Kazakhstan at Qarmet mines: safety, control and data lessons for engineers

    Kazakh steel and mining company Qarmet has installed an almost total underground visibility system at its eight former ArcelorMittal coal mines in Karaganda, combining helmet‑mounted cameras with live location tracking of every miner on a central control‑room schematic. Pre‑shift “health booths” at the portal process about 50 workers per hour, checking blood pressure, pulse, eye fatigue and alcohol, with roughly 1% barred from descending, and all footage stored on 1 TB helmet units and uploaded after each shift. The in‑house system, developed by teams of about 30 per mine, is paired with a privately funded medical centre delivering around 200 check‑ups a day, but raises unresolved questions about consent and long‑term use of pervasive surveillance in a company town setting.

    Gladiator–BlackRock Yukon raise: drilling scale-up and project lens for mine planners
    Mining
    about 7 hours ago

    Gladiator–BlackRock Yukon raise: drilling scale-up and project lens for mine planners

    Gladiator Metals has raised over C$35 million in a BlackRock-led private placement, issuing 7 million flow-through shares at C$3.87 and 3 million non-flow-through shares at C$2.65, lifting its treasury to about C$50 million and its market capitalisation to C$357.9 million. The funding fully covers the 2026–2027 drilling campaign at the Whitehorse Copper project in Yukon, targeting multiple high-grade prospects across a 35 x 5 km belt. Cowley Park, with more than 300 historical holes and 700 m of defined copper-molybdenum strike, will see drill capacity doubled from three to six rigs by late summer.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy