Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Safety

    Orica’s next-gen GroundProbe: geotech monitoring takeaways for mine slope teams

    April 8, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Orica Digital Solutions has launched a next-generation GroundProbe geotechnical monitoring platform aimed at mine slope stability, combining “future-ready” hardware with new software workflows for faster, higher-confidence decisions. The system is designed for quick, low-touch deployment and intuitive, risk-based monitoring workflows so small geotechnical teams can manage continuous radar or laser-based surveillance with less manual intervention. Orica is pitching the upgrade at operations needing rapid setup and streamlined data interpretation to support day-to-day geotechnical risk management around highwalls, tailings and pit ramps.

    Technical Brief

    • Low-touch deployment reduces time personnel spend near potentially unstable slopes during installation and setup.
    • Faster end‑to‑end workflows aim to shorten the interval between deformation detection and operational response.

    Our Take

    GroundProbe’s new geotech monitoring launch sits alongside Orica’s recent push to roll out its BlastIQ cloud platform to smaller North American mines and quarries, signalling a strategy to standardise digital tools across both blasting and slope stability workflows.

    Within our Mining safety-tagged coverage, Orica appears more frequently in connection with digital and sensing products than most explosives peers, suggesting it is positioning GroundProbe and other platforms as a differentiated, higher-margin services layer on top of its traditional consumables.

    For operators, tighter integration between Orica Digital Solutions and GroundProbe could allow a single data environment for blast design and wall movement monitoring, which in practice tends to reduce manual data handling and shorten response times to emerging geotechnical hazards.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 9 hours ago

    Perenti’s Barminco A$180m Duketon extension: planning notes for mine engineers

    Perenti’s underground mining arm Barminco has secured a A$180 million extension to its alliance-style contract with Regis Resources at the Duketon Operations in Western Australia’s Goldfields, building on the three-year agreement first announced on 2 April 2024. The extension keeps Barminco in place for additional years of underground development and production services, locking in fleet, workforce and ground support planning across multiple Duketon orebodies. Contractors and suppliers can expect continued demand for underground drilling, blasting, ventilation, and backfill consumables tied to Regis’ ongoing gold production strategy.

    Mining
    about 9 hours ago

    AngloGold Ashanti’s Normet SmartDrive at Cuiabá: ventilation and shotcrete lessons for engineers

    AngloGold Ashanti has deployed a Normet Utimec LF 600 Transmixer SD battery-electric concrete mixer at its Cuiabá underground gold mine in Brazil, claimed as the first electric concrete mixer operating in the country. The SmartDrive unit will undergo an 18‑month trial, targeting reduced diesel use and lower heat and exhaust loads in confined headings. For geotechnical and shotcrete operations, the trial will test whether battery haul and mixing cycles can maintain required concrete quality and placement rates without compromising ventilation design.

    Mining
    about 10 hours ago

    Cobre Panamá stockpiled ore approval: geotechnical and risk notes for engineers

    First Quantum Minerals has received formal approval from the Government of Panama to remove, process and export stockpiled ore at the 85 Mt/y Cobre Panamá copper complex, limited to material mined before the November 2023 suspension. The campaign will draw down existing ROM and crushed ore stockpiles to reduce geotechnical and environmental risks from long-term surface storage, including potential slope instability and contact water management issues. Processing will use the existing concentrator and tailings facilities under previously permitted operating parameters.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy