Modern Mining e-waste hub: process flowsheet and project metrics for engineers
Reviewed by Tom Sullivan

First reported on MINING.com
30 Second Briefing
Modern Mining Technology plans an 18‑month build‑out of its first commercial e‑waste metals recovery hub in North Carolina, targeting 40,000 gold‑equivalent ounces per year using an aqueous-based process fed by a one‑tonne‑per‑hour waste printed circuit board pre‑concentration plant. Backed by a US$40‑million IPO on 12 November and a pilot facility in Greenville that has shipped 41 concentrate lots since late 2023, the company claims metal grades around 100 times typical mined ore. Its hub‑and‑spoke design allows multiple pre‑concentration plants near e‑waste suppliers to feed a central purification plant, with R2 Standard certification pursued.
Technical Brief
- Pilot plant in Greenville has already shipped 41 metal concentrate lots (Dec 2023–Jun 2026).
- Development is staged in three phases, anchored by the recently closed US$40‑million IPO.
- First 6–9 months focus on constructing both the pre‑concentration plant and central aqueous purification hub.
- Supply contracts target recyclers, e‑waste aggregators and manufacturers to secure consistent printed circuit board feed.
- Staff training is scheduled alongside construction, indicating early operational readiness once mechanical completion is reached.
- Modern Mining is pursuing R2 Standard certification, embedding recognised responsible electronics recycling protocols into the hub.
- Market valuation sits at about US$77.6 million, with shares trading near US$2.31 on NYSE American.
- Company plans ongoing R&D to lift recovery rates and qualify additional metals and feedstocks for the same process flowsheet.
Our Take
Modern Mining’s US$77.6 million market capitalisation versus the roughly US$36.1 million value reported on its NYSE American debut in our earlier coverage signals that investors are already pricing in successful ramp-up of the Greenville, North Carolina e‑waste flowsheet rather than treating it as a pure pilot-stage bet.
The 1 tonne-per-hour waste printed circuit board capacity, combined with metal grades estimated at 100 times those of traditionally mined ores, positions this US e‑waste hub as a potential high-margin ‘urban mine’ that could stay competitive against many conventional gold and copper projects in our Mining database even at lower metal prices.
Alongside other critical-mineral recovery stories in our coverage, Modern Mining’s aqueous purification plant in North Carolina sits in a small but growing subset of US projects that target both gold and base/critical metals from secondary feedstocks, which may help de-risk supply chains without the permitting burden of new greenfield mines.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

