Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Contract Award

    Metso’s VSF SX-EW plants for Tia Maria: flowsheet implications for mine engineers

    March 30, 2026|

    Reviewed by Tom Sullivan

    Metso’s VSF SX-EW plants for Tia Maria: flowsheet implications for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Metso has signed a major agreement to supply its VSF solvent extraction and electrowinning (SX-EW) technology to Southern Peru Copper Corporation’s Tia Maria greenfield project in Cocachacra, Arequipa. The SX-EW plant is designed to produce 120,000 t/y of high-purity copper cathode, using Metso’s modular VSF cells and integrated electrowinning circuits. For process and project engineers, the deal signals a commitment to heap leach–SX-EW flowsheets at Tia Maria rather than conventional concentrator–smelter routes.

    Technical Brief

    • Metso’s scope covers both solvent extraction and electrowinning sections as an integrated VSF package.
    • Agreement is described as “major”, indicating a large multi-plant supply rather than single-line equipment.
    • Southern Peru Copper Corporation is among the world’s largest copper producers, signalling strong balance-sheet backing.

    Our Take

    Metso’s win at the copper-focused Tia Maria project in Peru comes as our database shows the company also pushing hard into iron ore pelletising for DR-grade green steel, signalling a deliberate strategy to anchor its process-plant footprint across both copper and low‑carbon steel value chains.

    Several recent items featuring Metso highlight bundled Life Cycle Services and integrated technology packages; if a similar model is applied at Tia Maria, Southern Peru Copper Corporation could lock in OEM-led performance guarantees for the SX‑EW circuit rather than just buying stand‑alone equipment.

    Within our 1168 Mining stories, copper projects like Tia Maria in Peru tend to face prolonged permitting and social-licence scrutiny, so securing a named process-plant supplier at this stage usually indicates that project engineering has moved into a more execution-ready phase.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 8 hours ago

    Boliden’s controlling stake in Nexa Resources: portfolio and capex lens for mine planners

    Boliden AB will acquire all of Votorantim SA’s shares in Nexa Resources SA, taking a 64.68% controlling stake while Votorantim retains about 7%, consolidating ownership of Nexa’s zinc and polymetallic operations in Brazil and Peru. The deal gives Boliden strategic control over Nexa’s integrated mining–smelting chain, including large-scale assets such as the Cerro Lindo and Vazante mines and Três Marias smelter. Engineers should watch for potential changes in capital allocation, mine life extension strategies and brownfield expansion across Nexa’s Latin American portfolio.

    Mining
    about 8 hours ago

    IMARC 2026 Innovation & Investment Alley: key takeaways for mine project teams

    IMARC will return its Innovation & Investment Alley in 2026, with Editorial Director Richard Roberts saying the event will again assemble one of the sector’s strongest line-ups of mining technology leaders and early‑stage innovators. More than 500 solution providers are expected in Melbourne, giving mine operators, contractors and investors concentrated access to digital mining platforms, automation vendors and equipment OEMs in a single venue. For engineers, the alley offers a dense snapshot of deployable technologies and pilot‑ready concepts that could feed directly into 2027–2030 project pipelines.

    Mining
    about 8 hours ago

    Metso Simberi expansion package: flowsheet and risk notes for gold plant engineers

    Metso has secured multiple process technology packages for the New Simberi Gold Project Expansion in Papua New Guinea, supplying grinding, flotation, thickening and filtration equipment. The project is owned by Simberi Gold Company Limited, a 50:50 joint venture between Lingbao Gold Group and St Barbara Limited, with engineering delivery led by Pitch Black Group. The deal signals further standardisation of Metso’s integrated comminution–flotation–tailings dewatering flowsheets on brownfield gold expansions in the Asia–Pacific region.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental