Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Contract Award

    Metso’s VSF SX-EW plants for Tia Maria: flowsheet implications for mine engineers

    March 30, 2026|

    Reviewed by Tom Sullivan

    Metso’s VSF SX-EW plants for Tia Maria: flowsheet implications for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Metso has signed a major agreement to supply its VSF solvent extraction and electrowinning (SX-EW) technology to Southern Peru Copper Corporation’s Tia Maria greenfield project in Cocachacra, Arequipa. The SX-EW plant is designed to produce 120,000 t/y of high-purity copper cathode, using Metso’s modular VSF cells and integrated electrowinning circuits. For process and project engineers, the deal signals a commitment to heap leach–SX-EW flowsheets at Tia Maria rather than conventional concentrator–smelter routes.

    Technical Brief

    • Metso’s scope covers both solvent extraction and electrowinning sections as an integrated VSF package.
    • Agreement is described as “major”, indicating a large multi-plant supply rather than single-line equipment.
    • Southern Peru Copper Corporation is among the world’s largest copper producers, signalling strong balance-sheet backing.

    Our Take

    Metso’s win at the copper-focused Tia Maria project in Peru comes as our database shows the company also pushing hard into iron ore pelletising for DR-grade green steel, signalling a deliberate strategy to anchor its process-plant footprint across both copper and low‑carbon steel value chains.

    Several recent items featuring Metso highlight bundled Life Cycle Services and integrated technology packages; if a similar model is applied at Tia Maria, Southern Peru Copper Corporation could lock in OEM-led performance guarantees for the SX‑EW circuit rather than just buying stand‑alone equipment.

    Within our 1168 Mining stories, copper projects like Tia Maria in Peru tend to face prolonged permitting and social-licence scrutiny, so securing a named process-plant supplier at this stage usually indicates that project engineering has moved into a more execution-ready phase.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Cemex and sensmore’s Rüdersdorf quarry: AI haulage lessons for mine planners
    Mining
    about 10 hours ago

    Cemex and sensmore’s Rüdersdorf quarry: AI haulage lessons for mine planners

    Cemex and Berlin-based startup sensmore are digitising operations at the 770-year-old Rüdersdorf limestone quarry in Germany using AI-based loading and haulage optimisation. On-board edge devices and radar sensors on wheel loaders and haul trucks feed real-time data into sensmore’s optimisation engine, which recommends bucket fill levels, truck–loader pairing and haul speeds. Early results show reduced idle times and more consistent crusher feed, signalling practical pathways to retrofit AI-driven dispatch and loading control into existing European quarry fleets without full autonomy.

    Mining
    about 10 hours ago

    Multotec spirals at Thaba JV: modular gravity circuit lessons for plant designers

    Multotec has supplied a customised suite of high-performance spiral concentrators to the Thaba JV chromite and PGM project in South Africa’s Limpopo province, providing an integrated gravity separation circuit tailored to the ore’s specific mineralogy. The solution is engineered to boost chromite and PGM recovery while tightening product grade control, with spiral configurations selected to allow rapid reconfiguration between different feed conditions and product specs. For plant designers and metallurgists, the key point is the emphasis on modular, flexible spiral layouts to sustain long-term performance as ore characteristics change.

    Mining
    about 10 hours ago

    Antofagasta copper ramp-up to 2030: design and risk notes for mine engineers

    Antofagasta plans to lift copper output by 30% by 2030, Executive Chairman and CEO Iván Arriagada told delegates at the World Mining Congress 2026, positioning the Chilean producer to meet surging critical minerals demand from the energy transition. The growth will come from brownfield expansions across its existing operations rather than new greenfield projects, implying higher stripping ratios, additional concentrator capacity and incremental tailings and water management upgrades. For engineers, the strategy signals sustained demand for large-scale pit optimisation, process debottlenecking and infrastructure life-extension work in northern Chile.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy