Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    MaxMine machine learning at Australian mine sites: haulage data lessons for engineers

    May 21, 2026|

    Reviewed by Tom Sullivan

    MaxMine machine learning at Australian mine sites: haulage data lessons for engineers

    First reported on International Mining – News

    30 Second Briefing

    MaxMine has rolled out a production-grade machine learning system for load and dump classification across Australian mine fleets operated by Glencore, NRW Holdings and Macmahon, with the platform now running continuously for six months. The edge-deployed models automatically tag truck payload events in near real time, sharply cutting missed or misclassified loads and reducing manual data cleaning by site engineers. Early results point to tighter haulage cycle control and more reliable production reporting, giving dispatch and planning teams higher-confidence payload and cycle-time data.

    Technical Brief

    • Consistent load/dump tagging improves temporal resolution of haul cycle datasets for bottleneck and queuing analysis.
    • Cleaner payload event streams support more stable short-interval control KPIs and exception-based reporting workflows.
    • Similar edge ML architectures could be extended to drill, dozer and ancillary equipment event classification.

    Our Take

    Glencore’s appearance here alongside MaxMine comes as our recent coverage of Glencore has focused heavily on safety incidents and closure pressures (e.g. Kazzinc in Kazakhstan and Cerrejón in Colombia), suggesting that production-grade machine learning in Australia may also be framed internally as a risk and compliance tool, not just an efficiency play.

    A six‑month fully operational period for the machine learning system is long enough to capture seasonal and roster-related variability at Australian sites, which should give contractors like Macmahon and NRW Holdings statistically robust baselines for cycle-time, fuel and maintenance optimisation before any wider rollout decisions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 8 hours ago

    Allight’s 16,000th MineSpec lighting tower: fleet and layout insights for mine planners

    Allight has completed its 16,000th MineSpec lighting tower at its Landsdale manufacturing facility in Western Australia, marking more than two decades of supplying mobile lighting to open-pit and underground mines globally. The diesel-powered MineSpec units are widely deployed on haul roads, waste dumps and fixed plant areas to support 24/7 operations, dust control and night-time drilling and blasting. For mine planners and contractors, the scale of this fleet signals strong aftermarket support, parts availability and standardised lighting layouts across multi-site operations.

    Mining
    about 8 hours ago

    Copper to the World Innovation Hour finalists: throughput and energy notes for mine teams

    Six organisations have been shortlisted for the Copper to the World Innovation Hour, where they will pitch live in September to address copper-sector bottlenecks linked to the energy transition, electrification and digital infrastructure. The finalists are developing technologies aimed at improving copper discovery, extraction and processing performance, with a focus on higher throughput, lower unit energy use and reduced environmental footprint across existing operations. For mine planners and metallurgists, the event signals where near-term innovation funding and pilot deployments in copper mining and concentrator circuits are likely to concentrate.

    Mining
    about 8 hours ago

    Thomas Vallant at Sandvik Ground Support: integration notes for mine engineers

    Sandvik has appointed Thomas Vallant as President of its Ground Support division within Sandvik Mining, effective 1 August 2026. Vallant, who joined Sandvik in 2005, has over 20 years’ mining experience and most recently led the Mechanical Cutting division, which covers continuous miners and roadheaders used in hard-rock and soft-rock development. The move signals continuity between Sandvik’s mechanical cutting and rock reinforcement product lines, relevant for integrated ground support solutions in mechanised underground mines.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy