Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Euro Mine Expo 2026: green transition technology takeaways for mine engineers

    May 21, 2026|

    Reviewed by Joe Ashwell

    Euro Mine Expo 2026: green transition technology takeaways for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Euro Mine Expo 2026 opens next week at Skellefteå Kraft Arena in northern Sweden, with a fully booked exhibitor floor and delegates expected from more than 40 countries. Organisers are positioning the exhibition area as a “leading arena for the green transition”, with suppliers showcasing low‑carbon mining equipment, electrified fleets and process optimisation technologies tailored to Nordic underground and open‑pit operations. For engineers, the event offers concentrated access to OEMs and technology developers working on decarbonised haulage, energy‑efficient comminution and digital monitoring of mine infrastructure.

    Technical Brief

    • Delegates from over 40 countries create a cross‑comparison point for regulatory approaches to low‑carbon mine design.

    Our Take

    With delegates from over 40 countries expected at Skellefteå Kraft Arena, Euro Mine Expo is positioning itself alongside global gatherings like the World Mining Congress 2026 in Peru, where International Mining is also involved, as one of the few truly international forums in our database focused on mining’s future direction.

    In our coverage of Boliden’s roll-out of ‘green fleets’ across its European copper, nickel and zinc operations, northern Sweden repeatedly appears as a test bed for low-emission mining; Euro Mine Expo’s location in Skellefteå gives OEMs and operators a convenient showcase close to active decarbonisation projects.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    2026 Australian Mining Prospect Awards: networking and project angles for engineers
    Mining
    about 3 hours ago

    2026 Australian Mining Prospect Awards: networking and project angles for engineers

    Tickets are now on sale for the 2026 Australian Mining Prospect Awards gala dinner, to be held on 16 September 2026 at Fraser’s Kings Park in Perth. The event will bring together mining professionals, contractors, OEMs and executives from across Australia to recognise finalists across multiple operational, innovation and ESG-focused award categories. Attendance offers operators, engineers and suppliers a concentrated networking opportunity with project decision-makers ahead of 2027 investment and tender cycles.

    FireFly’s Green Bay project economics: NPV, IRR and capex lens for mine planners
    Mining
    about 3 hours ago

    FireFly’s Green Bay project economics: NPV, IRR and capex lens for mine planners

    FireFly Metals’ Green Bay copper-gold project in Newfoundland now carries an after-tax NPV of A$2.2 billion (C$2.1 billion) at a 7% discount rate and a 42% IRR, with initial capital of A$513 million, giving more than four times NPV-to-capex leverage and planned throughput of 1.8 million tonnes per year over 32 years. Updated measured and indicated resources stand at 60.2 million tonnes grading 1.9% Cu, 0.5 g/t Au and 4.2 g/t Ag, containing 1.1 million tonnes Cu, 908,000 oz Au and 8.1 million oz Ag after 69,539 metres of underground drilling. A feasibility study is targeted for Q1 2027, with a final investment decision in H2 2027 and first concentrate potentially in mid-2029, backed by a proposed A$180 million equity raise split between an ASX institutional placement and a Canadian bought deal.

    Waratah’s new shallow high-grade Consols gold zone: pit design notes for planners
    Mining
    about 3 hours ago

    Waratah’s new shallow high-grade Consols gold zone: pit design notes for planners

    Waratah Minerals has extended the Consols gold system at its Spur project in New South Wales by 75m to the east and down-plunge, while identifying a new shallow high-grade zone. Step-out hole SPD074 intersected 12.7m at 1.35g/t gold from 44m downhole, defining a near-surface target with open extensions. For mine planners and geotechnical teams, the shallow geometry and incremental strike extension suggest potential for low-strip open-pit designs and simplified access for infill drilling and geotechnical characterisation.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental