Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    Master Drilling’s first remote drilling system in Canada: design and safety notes for mine engineers

    May 15, 2026|

    Reviewed by Tom Sullivan

    Master Drilling’s first remote drilling system in Canada: design and safety notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Master Drilling has commissioned its first remote drilling system in Canada at Agnico Eagle’s Odyssey Mine in Quebec, starting with reaming a 220-m hole using a 5.5-m diameter reamer. The RD7 raiseboring machine is operated remotely, removing personnel from the immediate drilling area while maintaining tight control of alignment and breakthrough. For geotechnical and mine planning teams, the successful large-diameter, long-hole trial signals growing viability of remote raiseboring for ventilation shafts and service raises in deep Canadian operations.

    Technical Brief

    • Remote drilling console is located away from the RD7, eliminating exposure at the raise collar.
    • Control system allows full manipulation of thrust, rotation and feed pressures from the remote station.
    • Real-time monitoring of torque, penetration rate and deviation enables early response to abnormal ground behaviour.
    • Remote cameras and on-board sensors provide visual and data feedback, replacing direct line-of-sight supervision.
    • Communication between RD7 and operator uses a dedicated digital link, reducing reliance on verbal shaft-side instructions.
    • System design reduces personnel presence around high-energy rotating equipment and high-pressure flushing circuits.
    • Fewer people at the face simplifies compliance with mine site exclusion zones and lock-out/tag-out procedures.

    Our Take

    Agnico Eagle’s roll-out of Master Drilling’s remote system at the Odyssey Mine in Quebec aligns with its broader capital push in Canada, including the planned C$14 billion spend in Ontario by 2030, signalling that productivity and safety tech is likely to be a major lever in justifying that investment pipeline.

    Quebec’s hard‑rock gold camps around Val‑d’Or, highlighted in our coverage as moving to deeper, more complex underground orebodies, are a natural test bed for large‑diameter (5.5 m) remote reaming, which could become a reference case for similar deep-level developments in the Abitibi belt.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Expander pivot pins: reducing long-term maintenance costs for mine fleets
    Mining
    about 5 hours ago

    Expander pivot pins: reducing long-term maintenance costs for mine fleets

    Hidden costs from traditional pivot pin maintenance on haul trucks, forestry harvesters and excavators are driving interest in Expander System’s oversized pivot pins with tapered sleeves, according to Nord-Lock Group head of sales Robin Persson. The retrofit design allows installation in worn pivot eyes without line boring or welding, using conical sleeves to create full-surface contact and reduce clearance growth. For mine maintenance teams, this can cut repeated pin replacement shutdowns and lower life-cycle costs on high-load joints such as dump body hinges, loader booms and articulation points.

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams
    Mining
    about 5 hours ago

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams

    Canadian Chrome Company has formed a three-person First Nations steering committee, including former Attawapiskat Chief Theresa Okimaw-Hall and former Marten Falls Chief Lawrence Baxter, to advise on its Ring of Fire chromite, nickel, copper and platinum assets in Ontario’s James Bay Lowlands. The committee will provide Indigenous perspectives to prospective buyers or partners ahead of any sale or merger involving CCC’s 90% interest in the Koper Lake project and 30% in the Big Daddy project. Both projects remain at pre‑PFS stage, with no new economic analysis disclosed.

    Boron One Serbia PEA update: economics and design notes for mine planners
    Mining
    about 5 hours ago

    Boron One Serbia PEA update: economics and design notes for mine planners

    Boron One’s updated PEA for the Piskanja underground boron project in southern Serbia lifts the after-tax IRR to 89% and NPV (10% discount) to US$558.8 million, with unchanged initial capex of US$79.9 million and a sub‑one‑year payback, but shortens mine life to 13 years and trims average annual EBITDA to US$87.7 million. The plan now targets average yearly output of 157,600 tonnes of colemanite, 83,800 tonnes of ulexite and 25,000 tonnes of boric acid, at all‑in sustaining costs of US$231.44 per tonne. The revised study incorporates new geotechnical testing, a 3D resource model by borate type and a binding offtake for at least 25,000 tonnes of boron products per year, subject to permitting and plant qualification.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental