Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Luca’s Campo Morado drilling: mine-life and expansion signals for planners

    August 7, 2026|

    Reviewed by Tom Sullivan

    Luca’s Campo Morado drilling: mine-life and expansion signals for planners

    First reported on MINING.com

    30 Second Briefing

    New drilling at Luca Mining’s 2,500 t/d Campo Morado underground polymetallic mine in Guerrero, Mexico, is intersecting long, near-surface sulphide intervals in unmined zones adjacent to existing workings. Standout hole CMUG-26-50 at Largo Norte cut ~184 m from 3.6 m depth grading 1.18 g/t Au, 72.42 g/t Ag, 0.39% Cu, 0.45% Pb and 1.67% Zn, including 18 m at 2.64 g/t Au and 152.34 g/t Ag, while Naranjo hole CMNJ-26-02 returned 9.6 m at 4.05 g/t Au, 241.09 g/t Ag and 0.90% Cu from 175.3 m. With C$34 million budgeted for 80,000 m of drilling across Campo Morado and Tahuehueto and 16.6 Mt already in measured and indicated resources, these near-infrastructure intercepts point to incremental tonnes and mine-life extension ahead of a year-end expansion technical update.

    Technical Brief

    • Campo Morado’s plant is rated at about 2,500 t/d, constraining how fast new tonnes can be absorbed.
    • The mine lies ~160 km south-west of Mexico City in Guerrero, with multiple discrete sulphide lenses already defined.
    • Current campaign uses two surface rigs plus one underground rig, enabling both step-out and infill coverage.
    • To date, 13,571 m from 60 underground holes and 20,063 m from 75 surface holes have been completed.
    • Campo Morado’s 2018 PEA reports 16.6 Mt M&I at 4.01% Zn, 0.80% Cu, 0.93% Pb, 123 g/t Ag and 1.70 g/t Au.
    • Contained metals in those resources total ~700 koz Au, 62 Moz Ag, 200 Mlb Cu, 300 Mlb Pb and 1.2 Blb Zn.

    Our Take

    Luca Mining’s parallel high‑grade success at Tahuehueto in Durango (7.6 m at 14.27 g/t gold in DDH26‑SU‑01 from our March 2026 coverage) suggests the company is systematically targeting resource growth across its Mexican portfolio rather than treating Campo Morado as a stand‑alone optimisation play.

    With Campo Morado already carrying about 200 million lb copper and 300 million lb lead in measured and indicated resources, the scale positions Luca in the mid‑tier base‑metals bracket within our copper‑ and gold‑tagged project coverage, which can improve its optionality for future streaming or royalty deals similar in structure to the US$500 million package seen in i‑80 Gold’s February 2026 financing.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 22 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 22 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 22 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental