Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    LiuGong DE100CE 100 t battery truck: haulage design notes for mine engineers

    November 20, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    LiuGong has unveiled an expanded electric mining line-up in Liuzhou, centred on the new DE100CE 100 t class battery haul truck showcased at its 2026 Global Distributor Annual Conference and Global Customer Festival. More than 2,000 delegates from over 120 countries saw multiple zero-emission machines positioned for construction and mining fleets, integrating battery-electric drivetrains with intelligent control systems. For mine operators, the scale of the 100 t truck signals growing OEM readiness for large-payload battery haulage in pit environments traditionally dominated by diesel.

    Technical Brief

    • Conference and customer festival jointly branded under the theme “Zero-Carbon Electric Intelligence, Empowering the Future”.
    • Green and intelligent technologies were presented specifically in construction and mining machinery operating scenarios, not prototypes only.
    • Focus on “deep integration” suggests coordinated development of powertrain, control systems and digital connectivity across platforms.
    • Scale and international mix of attendees positions LiuGong’s electric range for rapid export deployment once mine trials mature.

    Our Take

    LiuGong’s push into a 100 t battery truck follows its DW105AE battery truck deployment at a Conch Cement mine in south China, signalling that the company is moving from pilot-scale to a full mining-class electric haulage line-up rather than isolated demos.

    The new truck sits alongside LiuGong’s 200 t class 9200F excavator recently supplied to Jiangxi Copper Group, suggesting the OEM is positioning itself to offer a vertically integrated electric–ready loading and haulage package for large open-pit operations.

    With guests from 120 countries and earlier moves like the Indonesia Green Smart Industrial Park, LiuGong appears to be using high-profile electric launches to underpin a global export strategy for new-energy heavy equipment, not just domestic Chinese deployments.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Forrestania’s Edna May restart: contract and ramp-up takeaways for mine planners
    Mining
    about 7 hours ago

    Forrestania’s Edna May restart: contract and ramp-up takeaways for mine planners

    Forrestania Resources is preparing to restart gold production at the Edna May operation in Western Australia, targeting a December gold pour after locking in critical supply and mining services. A long-term sodium cyanide supply contract has been signed with Australian Gold Reagents, and Campbell Gold Haulage has been awarded the ore-loading and crusher-feed contract, securing run-of-mine handling to the primary crusher. With equipment and personnel mobilisation under way, processing continuity and reagent security are largely de-risked ahead of plant ramp-up.

    MinRes appoints new CFO from Perenti: capital and project finance lens for miners
    Mining
    about 7 hours ago

    MinRes appoints new CFO from Perenti: capital and project finance lens for miners

    Mineral Resources has appointed Perenti chief financial officer Michael Ellis as its next CFO, replacing long‑serving finance head Mark Wilson, who is retiring. Ellis, who joins MinRes on 19 May 2027, brings over 20 years’ finance experience, including more than a decade in mining services across contract mining, drilling and maintenance businesses. Executive general manager finance Jonathan Cowper will support the transition, signalling continuity in capital allocation, project financing and cost control across MinRes’ lithium, iron ore and mining services portfolio.

    SA exploration grants: drilling and geophysics outlook for project teams
    Mining
    about 7 hours ago

    SA exploration grants: drilling and geophysics outlook for project teams

    South Australia has awarded over $4.6 million in Plan for Accelerated Minerals (PACE) exploration grants to support up to 19 mineral projects, with the State Government expecting the funding to trigger more than $12 million in drilling and geophysics in 2027. The first-round grants target new copper, critical minerals and gold opportunities across multiple greenfield tenements, rather than brownfield resource extensions. Geologists and contractors can expect increased demand for deep RC and diamond drilling, high-resolution airborne surveys and basin-scale structural interpretation over the next 12–24 months.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental