Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Safety

    Life after gINT: data migration and integrity risks for geotechnical teams

    March 27, 2026|

    Reviewed by Joe Ashwell

    Life after gINT: data migration and integrity risks for geotechnical teams

    First reported on Geoengineer.org – News

    30 Second Briefing

    The retirement of Bentley’s gINT platform is forcing geotechnical teams to rethink borehole, lab and in situ data workflows built over decades around .gpj databases and log templates. Firms now face decisions on migrating legacy projects, revalidating correlations and AGS/CSV exports, and integrating cloud-based systems with GIS, BIM and common data environments such as ProjectWise. For practitioners, the key technical risk is loss of data integrity and traceability during conversion, especially where historic projects mix imperial/metric units, custom fields and non-standard symbol libraries.

    Technical Brief

    • Legacy .gpj files often embed project-specific picklists, expressions and lookup tables that do not map cleanly to AGS.
    • Many firms have hundreds to thousands of gINT projects, making one‑off manual QA of converted logs impractical.
    • Safety‑critical correlations (e.g. SPT–strength, CPT–pile capacity) must be re‑benchmarked when expression libraries are reimplemented.
    • gINT’s lack of enforced version control means historical design decisions can be hard to reconstruct during incident investigations.
    • For safety‑critical assets, firms are formalising data migration plans with sign‑off gates, test projects and parallel‑run periods.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Software
    about 22 hours ago

    Carlson 2027 CAD suite: interoperability and drafting gains for mine planners

    Carlson Software has released its 2027 CAD suite for Survey, Civil, Hydrology, GIS, Mining and Point Cloud, built on IntelliCAD 14.1 and fully compatible with AutoCAD 2027. The update adds native CAD tables, expanded point cloud handling and mining-specific drafting tools aimed at faster layout of pits, stopes and haul roads. For mine planners and geotechnical teams, the key gains are smoother data exchange with existing DWG workflows and reduced rework between survey, design and hydrology models.

    Travis Perkins Connect Scope 3 calculator: data and FCA-readiness notes for project teams
    Software
    1 day ago

    Travis Perkins Connect Scope 3 calculator: data and FCA-readiness notes for project teams

    Travis Perkins has launched Connect, a Scope 3 carbon calculator that assigns CO2e values to more than 120,000 products by mapping material weights in tonnes and kilograms and using manufacturer EPDs or recognised industry datasets. The tool, designed by a CCF-led team under Phil Monkman, automatically converts delivery and invoice data into auditable, report-ready embodied carbon figures, replacing manual entry of up to 3,000 data points per month for some subcontractors. Roll-out across Travis Perkins, CCF, Keyline, BSS and Managed Services targets upcoming FCA disclosure rules from 2027–28, reducing reliance on estimates that can be up to 60% inaccurate.

    Software
    3 days ago

    Acquire EnviroSys–GIM Suite integration: workflow and QA gains for mine teams

    Acquire Technology Solutions has linked its Envirosys 9.5 environmental compliance platform with its GIM Suite geological data management system, creating a single workflow for drill hole, monitoring and location records. Environmental teams can now pull borehole IDs, collar coordinates and monitoring point locations directly from GIM Suite into Envirosys, reducing manual duplication and reconciliation. For mine operators, this should cut reporting errors in groundwater, dust and discharge datasets that rely on accurate spatial and geological references.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental