Larvotto high-grade at Hillgrove Metz: underground potential and drilling notes for engineers
Reviewed by Tom Sullivan

First reported on Australian Mining
30 Second Briefing
Larvotto Resources has reported high-grade gold–antimony–tungsten intercepts from four lodes at the Metz Mining Centre within its Hillgrove project in New South Wales, including a newly identified lode named Echidna. Key results include 20.5m at 9.4g/t gold equivalent (AuEq) from 342.5m at Blacklode, with a higher-grade core of 6.2m at 27.2g/t AuEq from the same depth. The grades and depths point to underground mining potential and support further resource definition drilling targeting multi-commodity sulphide mineralisation.
Technical Brief
- Drilling targeted four discrete sulphide lodes within the Metz Mining Centre, including newly defined Echidna.
- Gold–antimony–tungsten association indicates complex polymetallic sulphide systems, favourable for underground selective mining.
- Reported intercepts are downhole lengths; true widths and geometries remain to be modelled.
- Data derive from diamond drilling, with downhole assays composited into reported mineralised intervals.
- Echidna’s identification expands the known lode inventory at Metz, increasing resource definition drilling priorities.
- High antimony and tungsten credits could materially influence cut-off grade optimisation and stope design economics.
- Results are currently limited to Metz; extrapolation to other Hillgrove centres will require further drilling.
- For mine planning, intercept depths and grades support evaluation of underground access options and sequencing strategies.
Our Take
The high-grade gold–antimony intersections at Blacklode come on the heels of Larvotto’s August restart and first concentrate from Hillgrove, suggesting these results could be fed relatively quickly into an existing processing route rather than requiring greenfield plant decisions.
Hillgrove is one of only a small subset of gold–antimony assets in our 1260 Mining stories, which tends to give Larvotto strategic leverage as antimony is classed as a critical mineral in several jurisdictions and often attracts different funding and offtake interest than pure gold plays.
With Larvotto simultaneously advancing copper growth options in Queensland (e.g. the Blockade mine and the proposed Hammer Metals consolidation), the Hillgrove project in New South Wales positions the company as a multi-commodity operator, which can help smooth cash flow volatility between precious and base metal cycles.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Tunnelling
Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


