Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety
    Product

    Jevons Robotics–Newmont pre-split loading robot: safety and design notes for pit engineers

    February 18, 2026|

    Reviewed by Joe Ashwell

    Jevons Robotics–Newmont pre-split loading robot: safety and design notes for pit engineers

    First reported on International Mining – News

    30 Second Briefing

    Jevons Robotics has signed an agreement with Newmont Australia to deploy an automated pre-split loading robot based on its ARTEV1000 rugged, battery-electric robotic platform in highwall mining environments. The packaged system is purpose-built for drill-and-blast pre-split loading, extending the ARTEV1000 from a proven autonomous carrier into a fully integrated explosives-handling unit. By automating loading on highwalls, Newmont aims to materially cut exposure hours for personnel working near unstable faces and blast lines, with implications for wider robotic deployment in hazardous pit zones.

    Technical Brief

    • Payload extension converts the carrier into a dedicated explosives-handling module with integrated loading hardware.
    • Packaged system implies pre-engineered interfaces between robot, explosive containers and blast-hole loading tools.
    • Automation targets pre-split blast patterns, where tight burden and spacing increase exposure risk for personnel.
    • Remote operation keeps shotfirers and offsiders away from highwall toes and crest edges during loading.
    • Robotic loading aligns with industry moves to treat drill-and-blast as a fully mechanised, segregated work area.

    Our Take

    Within our 1059 Mining stories, Australia-based automation deployments like this one increasingly sit in the Safety tag set, signalling that majors such as Newmont Australia are now framing robotics primarily as a risk-control tool rather than just a productivity play.

    Pre-split loading is typically one of the higher-exposure tasks for drill-and-blast crews, so automating it in Australia is likely to influence local regulatory and union expectations about what constitutes ‘reasonably practicable’ controls in similar underground and highwall environments.

    For equipment and product suppliers like Jevons Robotics, a reference deployment with Newmont Australia in our Projects and Product-tagged coverage can materially strengthen their case when bidding into other Tier 1 operators, who often look for proof-of-concept in comparable geotechnical and regulatory settings.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Silver stockpile drawdown risk: supply–demand lens for mining project teams
    Mining
    about 21 hours ago

    Silver stockpile drawdown risk: supply–demand lens for mining project teams

    Silver inventories at COMEX and London have fallen sharply from pandemic-era peaks – COMEX registered stocks are down more than 75% to about 79.9 million oz., while LBMA vaults hold 27,454 tonnes (≈883 million oz.), 20% below their 2021 record – yet analysts argue this does not prove a structural shortage. The World Silver Survey 2026 projects a 46.3 million oz. deficit and estimates 762 million oz. drawn from above-ground stocks since 2021, but CPM Group stresses that investment flows, working inventories and scrap – including “billions of ounces” in jewellery and electronics – can rapidly re-enter the market.

    Mining’s next boom off the map: frontier project risks and design notes for engineers
    Mining
    about 21 hours ago

    Mining’s next boom off the map: frontier project risks and design notes for engineers

    Depletion of high-grade deposits, declining ore grades and sustained high commodity prices are pushing miners towards frontier resources in the Arctic, on abyssal plains and eventually in space. Capital is already moving into Arctic projects targeting onshore and offshore deposits in ice-affected conditions, while proposed deep-sea mining of polymetallic nodules on abyssal plains faces an intensifying regulatory battle at the International Seabed Authority. Asteroid mining remains a long-dated, largely conceptual option, but is shaping early research into in-situ resource utilisation, autonomous extraction systems and ultra-remote operations.

    Hertha Metals’ Texas high‑purity iron plant: supply, process and capex notes for engineers
    Mining
    about 21 hours ago

    Hertha Metals’ Texas high‑purity iron plant: supply, process and capex notes for engineers

    Hertha Metals will break ground this summer on a Conroe, Texas plant to produce 10,000 tonnes per year of high-purity iron for neodymium-iron-boron magnets, using its FLEXHERS (Flexible Fuel Hydrogen Electric Reduction Smelting) process that couples an electric arc furnace with natural gas or hydrogen. The startup already runs a one-tonne-per-day pilot using Minnesota ore and plans to scale to roughly 500,000 tonnes per year within four to five years, targeting both magnet and electrical steel markets. With 90% of current high-purity iron output in China and a US DoD ban on Chinese-origin rare earth magnets taking effect on 1 January 2027, the project directly targets a looming supply-chain gap.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy