Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Grasberg smelter halt and aluminium surge: market stress lens for mine planners

    August 12, 2026|

    Reviewed by Joe Ashwell

    Grasberg smelter halt and aluminium surge: market stress lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Copper prices again approached record territory, with Comex September touching $6.7005/lb ($14,772/t) and LME three‑month holding around $14,195.50/t, as the Gresik smelter in Indonesia halted after an 8 August boiler leak, tightening supply from Grasberg while LME copper stocks slid to 218,300 t and cash premiums widened to $138/t. Aluminium gained up to 1.9% to $3,373/t after Norsk Hydro’s 6.3 Mt/y Alunorte alumina refinery cut output by half on Brazilian gas disruptions, against already low LME aluminium inventories of about 255,000 t amid Iran war‑related Middle East supply risks.

    Technical Brief

    • Gresik smelter shutdown follows an 8 August boiler leak, with repairs and assessment taking “weeks”.
    • PT Smelting, owned by Mitsubishi Materials and PT Freeport Indonesia, operates Gresik to process Grasberg ore.
    • Freeport’s Manyar smelter in East Java is scheduled to resume in September, partially offsetting Gresik’s outage.
    • Grasberg mine is still recovering from a fatal mudslide, with full output only targeted end‑2027.
    • LME copper cash–three‑month spread widened to a $138/t backwardation, signalling acute prompt‑metal tightness.

    Our Take

    Mitsubishi Materials appears in our database both as a shareholder in PT Smelting and as an active player in low‑carbon copper and critical minerals supply chains, including GHG‑traced Escondida copper cables and rare earth refining, signalling that disruptions at the Gresik smelter could ripple into several of its downstream decarbonisation initiatives.

    Freeport-McMoRan’s exposure to Grasberg and the Gresik/Manyar smelter complex comes after it recently joined the small group of miners above $100 billion market capitalisation in our coverage, so any prolonged Indonesian processing bottleneck is likely to be closely watched by large-cap investors already pricing in strong copper growth to 2027 and beyond.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 17 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 17 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 17 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental