Fireweed’s C$14m federal boost at Mactung: project and processing lens for engineers
Reviewed by Joe Ashwell

First reported on MINING.com
30 Second Briefing
Fireweed Metals will receive C$14 million from Natural Resources Canada’s global partnerships initiative to advance the Mactung tungsten-zinc project on the Yukon–Northwest Territories border towards a final investment decision, funding metallurgical testwork, tender-ready engineering designs and evaluation of an ammonium paratungstate (APT) midstream processing plant. The package follows up to C$12.9 million previously committed from the First and Last Mile Fund for North Canol corridor upgrades, including road and power access to the site. Fireweed says the new funding carries no commercial covenants or restrictions on future tungsten offtake.
Technical Brief
- The deposit straddles the Yukon–Northwest Territories border, driving cross‑jurisdictional permitting and infrastructure coordination.
- China currently supplies over 80% of global tungsten output, framing Mactung’s role in non‑Chinese supply.
- The First and Last Mile Fund allocation of up to C$12.9 million targets North Canol road and power upgrades.
Our Take
Fireweed Metals already features in our database as a recipient of sizeable private-sector funding (the C$61.5 million placement from JX Advanced Metals and the Lundin Family Trusts), so the added NRCan and First and Last Mile Fund support signals that Mactung and Macpass are moving into a capital stack where public and strategic money are tightly intertwined.
With China accounting for more than 80% of global tungsten production, this Canadian Mactung project fits into the same critical-minerals security narrative highlighted in our coverage of US federal support packages for tungsten and other strategic metals, implying that offtake or defence-linked interest could emerge once permitting and early works are de‑risked.
NRCan’s role here aligns with its broader push to channel capital into C$120 billion of planned Canadian mining projects over 10 years, so a tungsten-zinc player like Fireweed in Yukon and the Northwest Territories is well placed to benefit from streamlined permitting tools such as the Open Science and Data Platform as it advances both Mactung and its Jameson Land Basin licences.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


