Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    DELKOR India thickener for Arab Potash: process design notes for HLP engineers

    March 6, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    DELKOR India has secured an EPC contract from Arab Potash Company to supply a 50 m diameter DELKOR Thickener for the Hot Leach Potash (HLP) circuit in the firm’s latest capacity expansion project. The large-diameter unit is designed for high-throughput liquid/solid separation in hot brine conditions, a critical bottleneck in potash crystallisation and recovery. For process and tailings engineers, the installation signals further scaling of HLP operations at Arab Potash’s Jordan facilities, with implications for water balance, underflow rheology and downstream evaporation capacity.

    Technical Brief

    • Package is described as a “major” EPC contract, implying multi‑disciplinary engineering and construction involvement.
    • Robust liquid/solid separation design is tailored to potash brine chemistry and elevated operating temperatures.
    • Thickener selection is intended to support higher plant availability and reduced maintenance in corrosive brine service.
    • Similar large‑diameter thickeners are increasingly specified in potash expansions to debottleneck thermal and evaporation circuits.

    Our Take

    A 50 m-diameter thickener for a hot leach potash application puts Arab Potash’s expansion in the same ‘large-scale brine handling’ bracket as the big greenfield builds like BHP’s Jansen project, which our coverage notes has seen its Stage 1 capex estimate rise to US$8.4 billion.

    Across the several potash-tagged pieces in our database, most recent investment has clustered in Saskatchewan and the US, so a sizeable process-equipment award tied to Arab Potash signals that brownfield debottlenecking in established Middle Eastern brine operations is still attracting meaningful capex alongside the Canadian mega-projects.

    The focus on high-capacity mechanical and process units for potash – from Sandvik’s cutting hubs in Saskatoon to this 50 m DELKOR thickener – suggests operators expect sustained throughput growth and are standardising on fewer, larger units, which has implications for tailings and brine pond design loads at expansion projects.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Oklahoma critical minerals refining push: infrastructure and power notes for engineers
    Mining
    about 3 hours ago

    Oklahoma critical minerals refining push: infrastructure and power notes for engineers

    Oklahoma is positioning itself as a critical minerals processing hub rather than a mining state, anchored by Emirates Global Aluminium’s proposed US$4 billion primary aluminium smelter at the Port of Inola on the McClellan–Kerr Arkansas River system and backed by surplus low‑cost power from wind and natural gas. USA Rare Earth is building a vertically integrated rare earth magnet plant in Stillwater with about US$1.6 billion in public and private funding, while Stardust Power (NASDAQ: SDST) is advancing a lithium refinery in Muskogee with Sumitomo offtake and key permits secured. The cluster targets defence and aerospace demand around Tinker Air Force Base and other installations, aiming to plug the “missing middle” between raw mineral supply and finished components.

    Mining
    about 7 hours ago

    Thiess Global Summit at Mulgarrie AHS trial: retrofit autonomy lens for mine planners

    Thiess, together with MACA and RTL Mining and Earthworks, has visited Norton Gold Fields’ Mulgarrie operation near Kalgoorlie, where an autonomous haulage system (AHS) trial using EACON Mining Technology’s retrofitted trucks is under way. The trial, run with Norton Gold Fields (owned by Zijin Mining Group), is testing retrofit autonomy on an existing truck fleet rather than deploying factory-built autonomous units. For mine operators, successful validation would support lower‑capex conversion of conventional haul trucks to AHS across similar Australian gold and bulk operations.

    Luca’s 14 g/t gold hits at Tahuehueto: mine growth and design notes for engineers
    Mining
    about 8 hours ago

    Luca’s 14 g/t gold hits at Tahuehueto: mine growth and design notes for engineers

    Luca Mining has intersected high-grade mineralisation below existing workings at its Tahuehueto underground mine in Durango, with DDH26-SU-01 cutting 7.6 m at 14.27 g/t gold, 46.64 g/t silver, 0.33% Cu, 2.57% Pb and 1.19% Zn from 80.9 m, and DDH26-SU-03 returning 13.2 m at 6.66 g/t gold from 42.7 m. The new zones lie about 30 m below Level 23, which already hosts underground infrastructure, and grades are several times the current ~4 g/t AuEq head grade from the 1,000 t/d mill commissioned in 2025. Luca has increased the 2026 exploration budget at Tahuehueto by 40% to $3.5 million, with 47 drill holes totalling roughly 10,400 m completed so far across the Creston and Santiago vein targets, where brecciated quartz–sulphide veins remain open down plunge.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.