Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Pilar Gold PGDM Resemin–TEMPUS fleet: design and productivity notes for engineers

    May 22, 2026|

    Reviewed by Joe Ashwell

    Pilar Gold PGDM Resemin–TEMPUS fleet: design and productivity notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Pilar Gold Inc has selected Resemin and Sotreq as strategic equipment partners to supply a new underground fleet for the restart and modernisation of its PGDM gold mining complex in Brazil. The ordered package includes Resemin jumbo drills and production rigs, paired with TEMPUS-branded underground support equipment, to mechanise drilling and production across the mine’s ramp-accessed stopes. The deal signals a shift from legacy fleets towards standardised, OEM-supported rigs, with implications for ground support design, development advance rates and maintenance planning at PGDM.

    Technical Brief

    • Similar brownfield restarts could use this OEM-partner model to de-risk maintenance and fleet interoperability.

    Our Take

    Brazil-focused gold items in our database often highlight OEM–dealer combinations similar to Resemin and Sotreq, which usually signals an intent to secure local parts and service coverage critical for high-availability underground fleets at complexes like PGDM.

    Across recent gold project coverage, operators choosing specialised underground OEMs such as Resemin tend to be either deepening existing mines or pushing into narrower, more structurally complex orebodies, implying PGDM is likely moving into more technically demanding stopes rather than simple cut-and-fill extensions.

    TEMPUS-branded underground fleets in our records are typically positioned as mid-capex alternatives to the largest global brands, so Pilar Gold’s selection at a Brazilian gold complex suggests a cost–productivity balance strategy rather than a pure lowest-cost or premium-automation play.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 6 hours ago

    Weir’s early-stage water management push: design and risk lessons for mines

    Early-stage water management embedded in mine design, rather than retrofitted later, is being pushed by Marnus Koorts, Director of Capital and Process at Weir, as a core variable alongside throughput and grind size. Koorts argues that integrating water balances, tailings deposition plans and pump/sump layouts from concept study stage cuts risk of flooding, unplanned dewatering and costly rework. For engineers, this means specifying pipelines, thickeners and water-recovery circuits in initial flowsheets, not as bolt-ons once pit expansion or TSF instability exposes gaps.

    Mining
    about 6 hours ago

    ICMM names Froydis Cameron-Johansson CEO: ESG and tailings impacts for miners

    ICMM has appointed Froydis Cameron-Johansson as its next President and CEO, effective 23 November 2026, succeeding Rohitesh Dhawan after more than five years in the role. Cameron-Johansson brings senior global leadership experience from major mining houses, positioning her to influence ICMM’s work on tailings governance, Scope 3 emissions and responsible sourcing standards across its 26 member companies. Leadership continuity at ICMM matters for operators because its frameworks often feed directly into site-level ESG criteria, investor due diligence, and permitting expectations.

    McKinsey’s 2026 gold-led mining returns: key asset optimisation lessons for engineers
    Mining
    about 6 hours ago

    McKinsey’s 2026 gold-led mining returns: key asset optimisation lessons for engineers

    Record metals and mining returns entering 2026 are being driven largely by gold, with sector-wide market capitalisation at an all-time high and balance sheets among the strongest in a decade, McKinsey’s Global Materials Perspective 2026 reports. Behind the headline numbers, overall industry productivity has stalled and value creation is increasingly concentrated in a small group of top-quartile performers. For operators, this points to growing pressure to extract more value from existing assets through operational excellence, brownfield debottlenecking and disciplined capital allocation rather than volume-led growth.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental