Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Critical mineral shortages for AI: capex and supply gaps to 2035 for mine planners

    November 19, 2026|

    Reviewed by Tom Sullivan

    Critical mineral shortages for AI: capex and supply gaps to 2035 for mine planners

    First reported on MINING.com

    30 Second Briefing

    Critical mineral demand for AI infrastructure is set to outstrip mining supply by 17%–22% for copper, lithium and rare earths by 2035, with Global X estimating a single 1 GW data centre could need about 180,000 tonnes of materials, including 27,200 tonnes of copper. The report calls for roughly $550 billion in sector investment to 2040, rising to over $2 trillion when wider critical minerals and water infrastructure are included, amid 10–18 year mine development timelines, water constraints and highly concentrated processing. Data centres could also consume 20% of US electricity by 2035 versus about 6% today, with planned dispatchable generation meeting only 42% of new demand by 2030, signalling parallel pressure on grid expansion, cooling systems and power-intensive processing routes.

    Technical Brief

    • Global X’s Charting Disruption 2027 flags copper’s role in wiring, transformers, transmission and cooling hardware.
    • New greenfield mines typically require 10–18 years from discovery to commercial production, slowing supply response.
    • Concentrated processing in a few countries raises exposure to export controls, trade disputes and logistical disruption.
    • Rare earth demand is tied to permanent magnets in industrial drives, electric motors and high‑end equipment.
    • Mining project economics are constrained by permitting delays, financing bottlenecks and escalating construction CAPEX.
    • US data centre vacancy is forecast to drop to ~1% in 2026, with average rents up 73% since 2021.
    • Planned dispatchable generation shortfalls are expected to push capital towards nuclear, gas, renewables and grid modernisation, each with distinct mineral intensities.

    Our Take

    The projected 17–22% mined supply shortfall in copper, lithium and rare earths by 2035 aligns with other critical-mineral pieces in our database that show financial investors rotating into metals exposure via vehicles like Global X ETFs rather than directly into project equity, which can slow capital reaching new mines just as AI-related demand accelerates.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    CPS Chile composite roller plant: design and energy notes for mine conveyors

    CPS Conveyor Products and Solutions is opening a dedicated composite conveyor roller manufacturing plant in Santiago, Chile, claimed to be the first facility of its kind in the country. The plant will supply lightweight, corrosion‑resistant composite idlers tailored to long overland and high‑capacity mine conveyors in the Andean region, reducing freight lead times from overseas suppliers. For operators, local production should simplify spares logistics, support faster change‑outs on critical belts, and enable designs that cut rotating mass and energy draw compared with traditional steel rollers.

    Collective’s Apollo waste halo: pit optimisation and mill feed upside for engineers
    Mining
    about 1 hour ago

    Collective’s Apollo waste halo: pit optimisation and mill feed upside for engineers

    Collective Mining has intersected near-surface gold and silver in material previously classed as waste within the planned Apollo open pit at Guayabales, Colombia, including 107.85 metres at 0.79 g/t gold and 14 g/t silver from 3.75 metres and 146.1 metres at 0.66 g/t gold, 19 g/t silver and 0.04% copper from 106.5 metres, extending up to 60 metres beyond the current resource shell. National Bank of Canada estimates the shallow halo drilling now covers about 45% of the zone, averaging 0.83 g/t AuEq over 42.4 metres, suggesting scope to convert waste to mill feed and re-optimise pit economics. Collective plans US$100 million of Colombian spend in 2027, targeting a resource update in late 2027/early 2028 and an environmental licence application for Apollo in H2 2027, while AngloGold Ashanti advances the adjacent US$2.5 billion Quebradona copper project towards potential 2028 construction.

    Phoenix at Lexington mine: drill results and open-pit potential for engineers
    Mining
    about 1 hour ago

    Phoenix at Lexington mine: drill results and open-pit potential for engineers

    Phoenix Metals has reported broad mineralised intervals at the historic Lexington mine in southern British Columbia, with hole LXDDH-26-001 cutting 169 m from 41 m depth grading 1.02 g/t gold, 0.22% copper and 3.79 g/t silver, including a 38 m higher-grade zone. A second hole returned 233.5 m from 8.5 m depth at 0.26 g/t gold, 0.14% copper and 0.86 g/t silver, while two further holes averaged 0.18–0.20 g/t gold over more than 180 m each. Phoenix has outlined a 1.5 km by 300 m exploration footprint from 20 new holes (6,350 m) plus 170 historical holes, but must complete a resource estimate and economic study to assess open-pit viability.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental