Critical mineral shortages for AI: capex and supply gaps to 2035 for mine planners
Reviewed by Tom Sullivan

First reported on MINING.com
30 Second Briefing
Critical mineral demand for AI infrastructure is set to outstrip mining supply by 17%–22% for copper, lithium and rare earths by 2035, with Global X estimating a single 1 GW data centre could need about 180,000 tonnes of materials, including 27,200 tonnes of copper. The report calls for roughly $550 billion in sector investment to 2040, rising to over $2 trillion when wider critical minerals and water infrastructure are included, amid 10–18 year mine development timelines, water constraints and highly concentrated processing. Data centres could also consume 20% of US electricity by 2035 versus about 6% today, with planned dispatchable generation meeting only 42% of new demand by 2030, signalling parallel pressure on grid expansion, cooling systems and power-intensive processing routes.
Technical Brief
- Global X’s Charting Disruption 2027 flags copper’s role in wiring, transformers, transmission and cooling hardware.
- New greenfield mines typically require 10–18 years from discovery to commercial production, slowing supply response.
- Concentrated processing in a few countries raises exposure to export controls, trade disputes and logistical disruption.
- Rare earth demand is tied to permanent magnets in industrial drives, electric motors and high‑end equipment.
- Mining project economics are constrained by permitting delays, financing bottlenecks and escalating construction CAPEX.
- US data centre vacancy is forecast to drop to ~1% in 2026, with average rents up 73% since 2021.
- Planned dispatchable generation shortfalls are expected to push capital towards nuclear, gas, renewables and grid modernisation, each with distinct mineral intensities.
Our Take
The projected 17–22% mined supply shortfall in copper, lithium and rare earths by 2035 aligns with other critical-mineral pieces in our database that show financial investors rotating into metals exposure via vehicles like Global X ETFs rather than directly into project equity, which can slow capital reaching new mines just as AI-related demand accelerates.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.