Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    CPS Chile composite roller plant: design and energy notes for mine conveyors

    November 19, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    CPS Conveyor Products and Solutions is opening a dedicated composite conveyor roller manufacturing plant in Santiago, Chile, claimed to be the first facility of its kind in the country. The plant will supply lightweight, corrosion‑resistant composite idlers tailored to long overland and high‑capacity mine conveyors in the Andean region, reducing freight lead times from overseas suppliers. For operators, local production should simplify spares logistics, support faster change‑outs on critical belts, and enable designs that cut rotating mass and energy draw compared with traditional steel rollers.

    Technical Brief

    • CPS is extending its existing roller manufacturing footprint beyond Australia into a dedicated South American facility.
    • The Santiago plant is configured specifically for composite conveyor rollers rather than steel or rubber disc types.
    • CPS positions the Chilean facility to serve high-specification mining conveyors requiring tighter roller tolerances and reliability.
    • Composite roller production in-country allows CPS to align designs with Andean mine environmental and altitude conditions.
    • Locally engineered rollers can be matched to site-specific belt widths, speeds and loading regimes across Chilean operations.
    • CPS signals that demand growth in South America justifies permanent manufacturing infrastructure rather than import-only supply.
    • For other mining hubs, the move illustrates how regionalised roller plants can de-risk supply chains for critical conveyor components.

    Our Take

    For operators in Chile, local composite roller production from CPS should shorten lead times and reduce import exposure, which is increasingly relevant as other equipment innovations covered by International Mining (such as Global Air Cylinder Wheels’ ASW) also push mines to localise maintenance and spares strategies.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Collective’s Apollo waste halo: pit optimisation and mill feed upside for engineers
    Mining
    about 1 hour ago

    Collective’s Apollo waste halo: pit optimisation and mill feed upside for engineers

    Collective Mining has intersected near-surface gold and silver in material previously classed as waste within the planned Apollo open pit at Guayabales, Colombia, including 107.85 metres at 0.79 g/t gold and 14 g/t silver from 3.75 metres and 146.1 metres at 0.66 g/t gold, 19 g/t silver and 0.04% copper from 106.5 metres, extending up to 60 metres beyond the current resource shell. National Bank of Canada estimates the shallow halo drilling now covers about 45% of the zone, averaging 0.83 g/t AuEq over 42.4 metres, suggesting scope to convert waste to mill feed and re-optimise pit economics. Collective plans US$100 million of Colombian spend in 2027, targeting a resource update in late 2027/early 2028 and an environmental licence application for Apollo in H2 2027, while AngloGold Ashanti advances the adjacent US$2.5 billion Quebradona copper project towards potential 2028 construction.

    Phoenix at Lexington mine: drill results and open-pit potential for engineers
    Mining
    about 1 hour ago

    Phoenix at Lexington mine: drill results and open-pit potential for engineers

    Phoenix Metals has reported broad mineralised intervals at the historic Lexington mine in southern British Columbia, with hole LXDDH-26-001 cutting 169 m from 41 m depth grading 1.02 g/t gold, 0.22% copper and 3.79 g/t silver, including a 38 m higher-grade zone. A second hole returned 233.5 m from 8.5 m depth at 0.26 g/t gold, 0.14% copper and 0.86 g/t silver, while two further holes averaged 0.18–0.20 g/t gold over more than 180 m each. Phoenix has outlined a 1.5 km by 300 m exploration footprint from 20 new holes (6,350 m) plus 170 historical holes, but must complete a resource estimate and economic study to assess open-pit viability.

    Copper price craters: planning and capex implications for mine project teams
    Mining
    about 1 hour ago

    Copper price craters: planning and capex implications for mine project teams

    Copper futures collapsed to their lowest since April, with Comex December down as much as 6.7% to $5.5835/lb and LME three‑month prices off 5.6%, as AI‑linked speculative longs unwound, the dollar hit a 19‑month high and tariff bets faded despite Yangshan import premiums spiking to a record $360/t and Shanghai stocks sliding to 27,642 t. Eleven major copper‑exposed miners have shed $186 billion, or 20%, in a month, with Southern Copper down 26%, Ivanhoe Mines 34% and First Quantum 23%. Managed money net longs on Comex have dropped from over 80,000 to about 35,000 contracts, while Cochilco now sees Chilean output falling 8.4% in 2026 to 4.94 Mt, the lowest in 23 years.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    AllGeotechnicalInfrastructureHazardsEnvironmental