Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Copper price craters: planning and capex implications for mine project teams

    November 19, 2026|

    Reviewed by Joe Ashwell

    Copper price craters: planning and capex implications for mine project teams

    First reported on MINING.com

    30 Second Briefing

    Copper futures collapsed to their lowest since April, with Comex December down as much as 6.7% to $5.5835/lb and LME three‑month prices off 5.6%, as AI‑linked speculative longs unwound, the dollar hit a 19‑month high and tariff bets faded despite Yangshan import premiums spiking to a record $360/t and Shanghai stocks sliding to 27,642 t. Eleven major copper‑exposed miners have shed $186 billion, or 20%, in a month, with Southern Copper down 26%, Ivanhoe Mines 34% and First Quantum 23%. Managed money net longs on Comex have dropped from over 80,000 to about 35,000 contracts, while Cochilco now sees Chilean output falling 8.4% in 2026 to 4.94 Mt, the lowest in 23 years.

    Technical Brief

    • Comex December contract saw over 82,000 lots traded by midday during the sell-off session.
    • Price is now 19% below the $6.8885/lb record settlement reached on 9 September.
    • LME three‑month copper dropped as low as $12,772.50/t in official trading before extending losses.
    • Shanghai’s most‑traded copper contract closed at 97,920 yuan/t, with tin down over 7% in London.
    • Eleven major copper‑exposed miners lost $112 billion in a week and $49 billion in one session.
    • BHP’s market value fell to $178 billion, $32 billion lower than a month earlier.
    • Spot treatment charges hit a record minus $247.20/t on 6 November, implying smelters pay miners.
    • Cochilco reports Chilean mine output down 8.5% to 3.63 Mt for the first nine months of 2026.
    • Sulphuric acid imports into Chile reached 3.97 Mt last year, ~50% of consumption, with China supplying 37%.
    • Managed money net longs on Comex halved in six weeks, from >80,000 to ~35,000 contracts.

    Our Take

    The copper price slump described here sits awkwardly alongside US-backed stockpiling moves like Project Vault and the Gécamines–Mercuria copper JV in the DRC (both in our recent coverage), which effectively create a policy floor under long-term demand even as spot prices and miners such as Glencore and Ivanhoe Mines are hit hard in the short term.

    The Manyar smelter’s 2027 cathode premium offer into China, alongside China’s previous 37% share of Chile’s sulphuric acid imports, underlines how Asian smelting and chemical capacity is tightening the physical market even as futures-linked prices for copper and tin in London and Shanghai overshoot to the downside.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    CPS Chile composite roller plant: design and energy notes for mine conveyors

    CPS Conveyor Products and Solutions is opening a dedicated composite conveyor roller manufacturing plant in Santiago, Chile, claimed to be the first facility of its kind in the country. The plant will supply lightweight, corrosion‑resistant composite idlers tailored to long overland and high‑capacity mine conveyors in the Andean region, reducing freight lead times from overseas suppliers. For operators, local production should simplify spares logistics, support faster change‑outs on critical belts, and enable designs that cut rotating mass and energy draw compared with traditional steel rollers.

    Collective’s Apollo waste halo: pit optimisation and mill feed upside for engineers
    Mining
    about 1 hour ago

    Collective’s Apollo waste halo: pit optimisation and mill feed upside for engineers

    Collective Mining has intersected near-surface gold and silver in material previously classed as waste within the planned Apollo open pit at Guayabales, Colombia, including 107.85 metres at 0.79 g/t gold and 14 g/t silver from 3.75 metres and 146.1 metres at 0.66 g/t gold, 19 g/t silver and 0.04% copper from 106.5 metres, extending up to 60 metres beyond the current resource shell. National Bank of Canada estimates the shallow halo drilling now covers about 45% of the zone, averaging 0.83 g/t AuEq over 42.4 metres, suggesting scope to convert waste to mill feed and re-optimise pit economics. Collective plans US$100 million of Colombian spend in 2027, targeting a resource update in late 2027/early 2028 and an environmental licence application for Apollo in H2 2027, while AngloGold Ashanti advances the adjacent US$2.5 billion Quebradona copper project towards potential 2028 construction.

    Phoenix at Lexington mine: drill results and open-pit potential for engineers
    Mining
    about 1 hour ago

    Phoenix at Lexington mine: drill results and open-pit potential for engineers

    Phoenix Metals has reported broad mineralised intervals at the historic Lexington mine in southern British Columbia, with hole LXDDH-26-001 cutting 169 m from 41 m depth grading 1.02 g/t gold, 0.22% copper and 3.79 g/t silver, including a 38 m higher-grade zone. A second hole returned 233.5 m from 8.5 m depth at 0.26 g/t gold, 0.14% copper and 0.86 g/t silver, while two further holes averaged 0.18–0.20 g/t gold over more than 180 m each. Phoenix has outlined a 1.5 km by 300 m exploration footprint from 20 new holes (6,350 m) plus 170 historical holes, but must complete a resource estimate and economic study to assess open-pit viability.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental