Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Failure
    Safety

    Codelco’s El Teniente setback: seismic risk and supply impacts for mine planners

    August 6, 2026|

    Reviewed by Joe Ashwell

    Codelco’s El Teniente setback: seismic risk and supply impacts for mine planners

    First reported on MINING.com

    30 Second Briefing

    Suspended development of the Andes Norte section at Codelco’s El Teniente, triggered by new studies of an “emerging seismic phenomenon” at greater depth, may last up to two years and follows a July 2025 rockburst equivalent to magnitude 4.2 that killed six workers in adjacent Andesita and Teniente 7 panels. El Teniente’s output is already about 27% lower year-on-year and Codelco has conceded its 1.7 Mt/y copper target for 2030 is unattainable, tightening a market where CRU reports one LME participant holding 50–79.99% of live copper warrants. Comex September copper hit an intraday record of $6.7045/lb as Chile posted its weakest Q2 copper production in nearly 20 years, with traders diverting metal into the US ahead of possible tariffs.

    Technical Brief

    • Six-month geotechnical review at Andes Norte identified a new deep-level seismic mechanism unlike historically managed hazards.
    • The July 31, 2025 rockburst in Andesita and Teniente 7, magnitude-4.2 equivalent, triggered criminal, regulatory and technical investigations.
    • Suspension of Andes Norte development for up to two years is explicitly framed as a worker-safety protection measure, not an economic optimisation.
    • The emerging seismic phenomenon is described as depth-related, implying possible transition from structurally controlled to stress-driven failure regimes.
    • Similar deepening projects globally are being cautioned that conventional rockburst controls may be insufficient once operations push into comparable stress domains.

    Our Take

    In our database, Codelco already features heavily in recent copper price coverage, and the El Teniente setback compounds a pattern where Chilean supply issues are repeatedly cited alongside tight LME warrant control and record Comex levels above $6.60/lb.

    The suspension at the Andes Norte section lands just as Codelco is also delaying its Maricunga lithium project to 2034, signalling that Chile’s state miner is simultaneously under strain in both copper and lithium build‑outs rather than being able to lean on battery metals growth.

    With El Teniente output already at a 25‑year low and Codelco publicly shifting to ‘profitability over volume’ in July 2026, high‑cost or geotechnically complex copper expansions in the Andes are likely to face tougher internal hurdle rates, which could open space for lower‑risk producers such as Freeport‑McMoRan and Southern Copper highlighted in other recent copper price pieces.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US DOE $73M Mine of the Future funding: key testbed insights for engineers
    Mining
    about 6 hours ago

    US DOE $73M Mine of the Future funding: key testbed insights for engineers

    The US Department of Energy has awarded US$73 million through its Mine of the Future initiative to four projects creating national-scale mining testbeds in West Virginia, Colorado, Arizona, Missouri and Texas. Innovative Wireless Technologies will integrate underground and surface sites in Julian, Blacksburg and Idaho Springs to validate next‑generation digital, connectivity and automation systems, while the University of Arizona and University of Missouri will build underground and comminution proving grounds focused on electrification and energy management. Southern Methodist University will repurpose a heavily instrumented Navasota drilling site into a “synthetic mine” for repeatable testing of drilling, sensing and autonomous workflows, aiming to de‑risk commercial deployment.

    Mining leads Canadian PM’s C$1T pitchbook: project finance signals for engineers
    Mining
    about 6 hours ago

    Mining leads Canadian PM’s C$1T pitchbook: project finance signals for engineers

    Mining projects dominate Prime Minister Mark Carney’s leaked C$1 trillion, five‑year investment pitchbook, with 63 of 167 opportunities spanning lithium, nickel, graphite, rare earths, gold and copper, and including proposals such as Canada’s first uranium refining and conversion plant in more than 40 years. Confirmed entries range from LithiumBank’s Boardwalk lithium brine project in Alberta, with 5.2 million measured and indicated tonnes LCE at 81.6 mg/L, to Surge Copper’s Berg copper‑molybdenum project, scoped for a 28‑year life and 176 million lb copper per year. Despite a 75% year‑on‑year rise to C$10.1 billion in TSX/TSXV mining equity raisings, pension and sovereign funds remain cautious on finite‑life mines, making long‑life assets and midstream processing plants more likely to secure capital.

    Cyclic Materials’ Mesa rare earth recycling plant: process and scale notes for engineers
    Mining
    about 6 hours ago

    Cyclic Materials’ Mesa rare earth recycling plant: process and scale notes for engineers

    Cyclic Materials has opened a 144,000-square-foot rare earth magnet recycling plant in Mesa, Arizona, designed to process up to 25,000 tonnes per year of magnet-bearing end-of-life products using its proprietary MagCycle mechanical separation technology. The feedstock-agnostic facility is already running at 8 tonnes per hour, producing Mag-Xtract rare earth magnet material and recovering copper, aluminium and steel for sale to US smelters, with over 7,000 tonnes of material already delivered. Backed by more than US$20 million in investment, the plant is intended as a replicable model ahead of a planned South Carolina rare earth recycling campus.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental