Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Clean TeQ Water ATA tailings plant at Rasp Mine: design and risk notes for engineers

    May 18, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Clean TeQ Water has secured a design-and-construct contract from Broken Hill Operations for an ATA® Tailings Dewatering Plant at the Rasp Mine in Broken Hill, New South Wales, supporting the site’s production ramp-up. The plant will apply Clean TeQ’s proprietary ATA® (Advanced Tailings Aggregation) technology to dewater tailings, enabling higher-density deposition and reduced reliance on conventional tailings storage. For geotechnical and processing teams, this signals a shift towards drier stacked or thickened tailings strategies at a long-established lead-zinc-silver operation.

    Technical Brief

    • Contract awarded as a design-and-construct package, giving Clean TeQ Water single-point delivery responsibility.
    • Client is Broken Hill Operations, a wholly-owned subsidiary of Broken Hill Mines, at Rasp Mine.
    • ATA® Tailings Dewatering Plant is explicitly tied to the mine’s current production ramp-up programme.
    • Scope centres on a dedicated tailings dewatering facility, rather than retrofitting existing process plant.
    • Clean TeQ Water’s role extends beyond technology supply to full EPC-style implementation of the ATA® system.
    • For similar brownfield mines, bundling proprietary dewatering tech with D&C delivery reduces interface and schedule risk.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 12 hours ago

    Decoda haul road monitoring in Chile and Brazil: design and safety notes for mine teams

    Decoda is expanding its haul road monitoring technology into Chile and Brazil through a partnership with TECWISE Latam, targeting large open-pit truck fleets in two of the world’s biggest mining markets. Early deployments have shown gains in truck availability, extended tyre life and higher haulage productivity by continuously assessing road condition and driving behaviour. For mine operators, the move offers a data-driven route to optimise haul road design, maintenance intervals and speed policies without major changes to existing truck fleets.

    Mining
    about 13 hours ago

    Epiroc digital mine planning with OreInventory: integration notes for engineers

    Epiroc is rolling out a global, integrated suite of digital mine planning tools that combines its recently acquired OreInventory solution with existing platforms such as Mobilaris Mining Intelligence and Underground Manager. The consolidated offering links long‑term planning, short‑interval control and real‑time production data, aiming to give engineers a single environment for blast design, scheduling, stockpile tracking and reconciliation. For operations teams, the move signals tighter integration between fleet data, geology models and inventory management, reducing manual data handling and improving the fidelity of mine‑to‑mill planning.

    Mining
    about 15 hours ago

    Agnico Eagle’s 400,000 oz/y Hope Bay plan: design and logistics notes for mine teams

    Agnico Eagle Mines has approved investment in the Hope Bay project in Nunavut after a preliminary economic assessment outlined an underground mine feeding a 6,000 t/d processing plant. The 2026 study targets annual gold output of 400,000–435,000 oz, a step change from historic production at the previously operated complex. For mine planners and process engineers, the scale implies high-capacity underground materials handling, paste backfill or similar ground support strategies, and a concentrator sized for Arctic logistics and power constraints.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental