Clarion’s Latimer Ealing scheme tops out: fabric and MEP notes for engineers
Reviewed by Tom Sullivan

First reported on The Construction Index
30 Second Briefing
Clarion Housing Group’s development arm Latimer has topped out the 296‑home Twyford Park scheme in Ealing with JJ Rhatigan, with 50% of units designated as affordable and private sales already launched. The development integrates rooftop solar PV and air‑source heat pumps for all homes, shifting space and water heating to renewable electricity and targeting lower operational energy costs for residents. Twyford Park sits alongside the restoration of Twyford Abbey’s heritage buildings and landscape, and complements Clarion’s nearby Sherwood Close regeneration, delivering 362 homes, about two‑thirds affordable.
Technical Brief
- Shared ownership units are programmed to enter the market from September, implying near‑term internal completion targets.
- Twyford Park is configured as part of a wider neighbourhood masterplan tied to Twyford Abbey’s restoration.
- Renewable‑only space and water heating removes gas infrastructure, simplifying below‑ground service coordination and riser design.
- Clarion’s partnership with Ealing Council spans multiple sites, including Sherwood Close’s 362‑home regeneration nearby.
Our Take
Clarion Housing Group’s pipeline in our database now spans multiple London boroughs – from Tower Hamlets (East Riverside and Clare House) to Greenwich (Woolwich Leisure Centre scheme) and Merton (High Path estate) – signalling a sustained, multi-borough regeneration strategy into which the Ealing Twyford Park and Sherwood Close schemes neatly slot.
With Twyford Park and Sherwood Close together adding more than 650 homes, Latimer’s role here aligns with its much larger Tendring Colchester Borders Garden Community proposal (7,750 homes), suggesting the Ealing projects are part of a stepped scaling-up of its masterplanning and delivery capability ahead of major garden community work.
JJ Rhatigan’s appearance alongside Clarion and Latimer in Ealing adds another contractor to Clarion’s London roster, which in other recent pieces has been dominated by The Hill Group and Taylor Wimpey, potentially giving Clarion more leverage on build costs and programme risk across its wider UK portfolio.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


