Chile copper output nears 23-year low: cost and process impacts for mine planners
Reviewed by Tom Sullivan

First reported on MINING.com
30 Second Briefing
Chile’s copper output is forecast to drop 6.6% to 5.034 million tonnes in 2026, its weakest level since 2003, as ageing deposits, lower ore grades and disruptions at mines such as Escondida, Spence and El Teniente erode production despite $25 billion in new projects submitted to the Environmental Impact Assessment System. Sulfuric acid imports hit a record 3.97 million tonnes in 2025, with China supplying 37% before export curbs, while domestic acid output fell 17.2% to 3.92 million tonnes as smelters ran at about 60% capacity. Spot acid prices in Chile spiked from roughly $190 to $485 per tonne between February and mid-June 2026, pushing SX-EW input costs from $0.42 to $0.73 per lb and forcing operators such as Capstone’s Mantoverde to cut leaching and pivot to sulphide processing.
Technical Brief
- August 2026 copper output dropped 12.7% year-on-year to 366,000 tonnes due to grade, weather, disruptions.
- Escondida, Spence, Centinela, Los Pelambres, Caserones and El Teniente all reported production hits from rockburst and snowfall.
- New mines and expansions since 2003 (e.g. Spence, Caserones, Sierra Gorda) delivered 1.33 Mt in 2025, largely offsetting legacy declines.
- Codelco’s contained molybdenum output rose 36.3% year-on-year in September to 1,114.5 tonnes, contrasting sharp falls at Caserones, Sierra Gorda and Los Pelambres.
- Domestic smelters ran at ~60% capacity in 2025 after Ventanas closure, Paipote suspension, Potrerillos shutdown and El Teniente disruptions.
- SX-EW contributes ~21% of Chilean copper but consumes ~88% of national sulphuric acid, heavily coupling leach output to acid logistics.
- Acid consumption intensity varies from 0.78 to 22.4 t acid per tonne cathode, creating wide mine‑to‑mine cost exposure.
- GEM estimates ~11% of Chilean copper is proportionally exposed to imported acid, including ~4% tied to Chinese-origin supply.
- Capstone cut Mantoverde’s 2026 acid requirement by ~200,000 t by prioritising sulphide processing over leaching.
- Cochilco projects copper-mining acid demand rising from 6.9 Mt (2025) to 7.9 Mt (2027), implying a potential ~4 Mt supply gap if domestic output stagnates.
Our Take
KGHM’s role at Sierra Gorda links this Chilean output squeeze to its wider copper growth strategy; our database shows the recently approved Sierra Gorda expansion in Antofagasta is one of the few large-scale additions that could partially offset declining grades and ageing assets in Chile.
The sharp rise in sulfuric acid input costs for SX-EW copper in Chile directly affects projects that rely on imported reagents; in our coverage of 326 copper- and sulfuric-acid-tagged pieces, similar reagent-price shocks have typically forced operators to defer marginal leach expansions or accelerate transitions back toward concentrator-based flowsheets.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


